FAQ


FAQAbout Products
- FAQ > Drive Products > Inverters-FREQROL > FREQROL-F700
FAQ
Keyword Search
FAQ within [ FREQROL-F700 ]
-
You can select from the output power (in 0.01 kW units) and cumulative energy (in 1 kWh/0.01 kWh units). More Details >>
- No:21885
- Release Date:2018/08/22 16:29
-
You can check the fault records with Pr.544 (CC-Link extended setting) set to "12" for double setting.Set H74 for the instruction code and turn ON RYF. More Details >>
- No:21829
- Release Date:2018/08/22 16:29
-
No. You cannot check the accumulated number of rotations on the monitor. More Details >>
- No:21715
- Release Date:2018/08/22 16:29
-
No, it does not run. "Err" is displayed when it is operated. Always input the same voltage (400 V) to the main power supply and control power supply. More Details >>
- No:21179
- Release Date:2018/08/22 16:26
-
The operation cannot be manually switched to the commercial power supply operation at an inverter fault. The operation can be automatically switched to the c... More Details >>
- No:21191
- Release Date:2018/08/22 16:26
-
For the inverter, the option card FR-A7NC is necessary. More Details >>
- No:21897
- Release Date:2018/08/22 16:29
-
Up to 42 units can be connected. (When only inverters are connected) More Details >>
- No:21873
- Release Date:2018/08/22 16:29
-
You cannot monitor the running frequency and conveyor speed (machine speed) simultaneously.The inverter does not have a function to output them simultaneously. More Details >>
- No:21827
- Release Date:2018/08/22 16:29
-
Set Pr.13 (Starting frequency) or Pr.2 (Lower limit) to "5 Hz".Also set Pr.10 (DC injection brake operation frequency) to "5 Hz".The inverter does not operat... More Details >>
- No:21790
- Release Date:2018/08/22 16:29
-
This subroutine is to check the data link status and needs to be executed only once at the start of the program. More Details >>
- No:21767
- Release Date:2018/08/22 16:29
261-270 of Total 295