Start main contents

Factory Automation

FAQ

Factory Automation

FAQAbout Products

  • Font Size
  • S
  • M
  • L

FAQ within [ FREQROL-F700 ]

281-290 of Total 296

prev 29 / 30page next
  • Switching between external operation and NET operation

    You can switch between external operation and NET operation by turning ON/OFF the terminal X66 (RM). You can switch while Pr.79 (Operation mode) is set to "6... More Details >>

    • No:21688
    • Release Date:2018/08/22 16:28
  • Megger test

    When carrying out the megger test of the inverter, shorten all the terminals R, S, T, U, V, and W of the main circuit and use the 500 VDC megger for earth. D... More Details >>

    • No:21327
    • Release Date:2018/08/22 16:27
  • Frequency setting

    When turning the setting dial to set the frequency, press the "SET" key while the desired value blinks. (The setting frequency and "F" flicker alternately.) More Details >>

    • No:21742
    • Release Date:2018/08/22 16:29
  • MRS setting

    1. For MRS, coasting starts when the MRS contact turns ON. For Pr.250 = "0",IM is coasting immediately when the start signal is turned OFF.  2. No. Set eithe... More Details >>

    • No:21360
    • Release Date:2018/08/22 16:27
  • Faults history

    Press the "MODE" key on the operation panel several times to display the faults history screen "E---". Then turn the setting dial to display the error displa... More Details >>

    • No:21355
    • Release Date:2018/08/22 16:27
  • JOG function

    When Pr.79 is set to "3", the JOG operation is not available by turning ON the terminal JOG.Instead of the JOG function, you can set the low-speed RL of the ... More Details >>

    • No:21760
    • Release Date:2018/08/22 16:29
  • NET operation mode

    Set Pr.340 (Communication startup mode selection) to "1" or "2".Also, by setting Pr.79 (Operation mode selection) to "0", "2", or "6", the inverter enters th... More Details >>

    • No:21879
    • Release Date:2018/08/22 16:29
  • NET mode, external operation switching

    You can switch between the NET mode and external operation.Assign the X66 signal (Operation switching) to an unused terminal for switching.Also, set Pr.79 (O... More Details >>

    • No:21906
    • Release Date:2018/08/22 16:30
  • Switching between PU and NET operations

    Even after setting Pr.340 to "10", the change is reflected after resetting the power supply.Perform the power reset.Since changes to the communication parame... More Details >>

    • No:21696
    • Release Date:2018/08/22 16:28
  • Error "E.UVT" (undervoltage protection)

    The possible causes of the error UVT are as follows.- Low power supply voltage - Insufficient power supply capacity - Damage or failure Check the power suppl... More Details >>

    • No:21295
    • Release Date:2018/08/22 16:26

281-290 of Total 296

Inquiries