Start main contents

Factory Automation

FAQ

Factory Automation

FAQAbout Products

  • Font Size
  • S
  • M
  • L
  • No : 22044
  • Release Date : 2018/08/22 16:30
  • Print

Installing parameter unit outside control panel

Is it possible to remove the current operation panel (FR-DU04) from the inverter installed inside control panel and bring it to the enclosure surface (by connecting it and inverter via a cable)?
Can I replace the modular connection between the inverter and operation panel with a 10BASE-T cable (within 20 m in length)?
Category : 

Answer

You can install the operation panel FR-DU04 (or parameter unit FR-PU04) on the enclosure surface by connecting it with the inverter via a cable.
To do this, disconnect the inverter and operation panel and connect them with an EIA568-compliant cable (for example, 10BASE-T straight cable).
The maximum wiring length allowed is 20 m.
Product Name
Inverter, magnet motor drive
Product Category
Inverter
Series
FR-A500

May I have your opinion?

Please provide your feedback below. This is for feedback only. You will not receive a response.

Inquiries