FAQ


FAQAbout Products
- FAQ > Low-voltage Power Distribution Products > Low-voltage Circuit Breakers > Air Circuit Breakers
FAQ
Keyword Search
FAQ within [ Air Circuit Breakers ]
-
Horizontal connection type (standard: AE-SW up to 3200A except 2000-SWA), Vertical connection (VT) type (standard: 2000-SWA,4000-SWA -6300-SW) and Front conn... More Details >>
- No:22417
- Release Date:2018/08/31 14:33
-
ACB add earth leakage protection
When earth leakage current protection module (ER) is attached, it is possible to protect against earth leakage current. "Trip" or "Alarm signal output" can b... More Details >>
- No:22420
- Release Date:2018/08/31 14:33
-
Generally, there is no Mechanical Trip indication of continuous output for AE-SW. It is necessary to indicate electrically by using OCR Alarm (AL) output or ... More Details >>
- No:22432
- Release Date:2018/08/31 14:33
-
This contact(SBC) is used to auxiliary switch(AXb) contact. When Drawout type ACB is moved from "test" position to "disconnect" position, AXb contact will b... More Details >>
- No:22416
- Release Date:2018/08/31 14:33
-
For Shunt Trip (SHT), it is the time from voltage application to open ACB main contact * AE3200-SW or less, AE4000-SWA: 0.04 sec or less* AE4000-SW to AE6300... More Details >>
- No:22418
- Release Date:2018/08/31 14:33
-
Setting change operation while power is on
It is forbidden to change the characteristic when the breaker ON. Over current trip and earth leakage trip characteristics should be changed by a person with... More Details >>
- No:37699
- Release Date:2020/01/18 09:58
-
(1) and (2) are impossible. More Details >>
- No:24818
- Release Date:2019/04/09 15:03
-
ACB How to store drawout handle
Set the handle holder to the right side of the drawout frame with the included screw and nut, and store the drawout handle. However, the circuit breaker with... More Details >>
- No:22437
- Release Date:2018/08/31 14:33
-
Ground fault protection (GFR) is prepared as option, it is possible to detect and protect against ground fault current. "Trip" or "Alarm signal output" can b... More Details >>
- No:22412
- Release Date:2018/08/31 14:33
-
The time between application of voltage to the closing coil (CC) and closing of the main contact is 0.08 sec or less. More Details >>
- No:22440
- Release Date:2018/08/31 14:33
11-20 of Total 23