FAQ


FAQAbout Products
- FAQ > Low-voltage Power Distribution Products > Power Management Meters
FAQ
Keyword Search
Power Management Meters
FAQ within [ Power Management Meters ]
-
Setting upon delivery (ME96SS series).
It is not available. All configuration shall be conducted by the customer. More Details >>
- No:22149
- Release Date:2018/08/27 16:41
- Update:2020/04/10 15:49
- Category: Electrical Indicators
-
Recommended update period (ME96SS series).
The expected lifetime is 10 years. Is recommended to replace the device every 10 year. However the environment of installed location, such as temperature ... More Details >>
- No:22154
- Release Date:2018/08/27 16:41
- Update:2020/04/10 16:02
- Category: Electrical Indicators
-
Display digit of ACTIVE ENERGY
In the case of "6-digit display", the upper 3 digits of "9-digit display" are hidden. For details, refer to the Instrument User's Manual which you use. ・El... More Details >>
- No:24809
- Release Date:2019/03/27 14:44
- Category: Electrical Indicators
-
Availability for special primary current and special primary voltage (ME96SS series).
This model is able to be used under unusual primary current and unusual primary voltage as long as the user sets each value within the selectable range as ... More Details >>
- No:22148
- Release Date:2018/08/27 16:41
- Update:2020/04/10 15:15
- Category: Electrical Indicators
-
Replied value on the communication operation test of test mode (ME96SS series).
(A) Measurement values As for the measurement elements on the test mode screen, the set values are displayed. As for the other measurement elements, 0 is ... More Details >>
- No:22185
- Release Date:2018/08/27 16:41
- Update:2020/04/13 09:17
- Category: Electrical Indicators
-
Support status for IEC61850 (ME96SS series).
This model does NOT comply with the IEC61850. More Details >>
- No:22147
- Release Date:2018/08/27 16:41
- Update:2020/04/10 15:11
- Category: Electrical Indicators
-
Concurrent-use of MODBUS RTU and MODBUS TCP (ME96SS series).
MODBUS RTU communication and MODBUS TCP communication can be used at the same time. More Details >>
- No:22188
- Release Date:2018/08/27 16:41
- Category: Electrical Indicators
-
Wiring for only measuring current (ME96SS series).
It is unnecessary. (It is necessary to prepare an auxiliary power supply which supplies power between MA and MB.) More Details >>
- No:22174
- Release Date:2018/08/27 16:41
- Update:2020/04/10 16:50
- Category: Electrical Indicators
-
Measuring received energy and the transferred energy (ME96SS series).
It is possible to measure the received energy and the transferred energy separately. More Details >>
- No:22176
- Release Date:2018/08/27 16:41
- Update:2020/04/10 16:53
- Category: Electrical Indicators
-
Availability for direct measurement of 400V loads (ME96SS series).
This model is available for direct measurement of 400V loads at the STAR connection in Three-phase 3-wire system. More Details >>
- No:22150
- Release Date:2018/08/27 16:41
- Category: Electrical Indicators
21-30 of Total 57