FAQ


FAQAbout Products
- FAQ > Low-voltage Power Distribution Products > Power Management Meters > Electrical Indicators
FAQ
Keyword Search
FAQ within [ Electrical Indicators ]
-
Turning off the LCD display and backlight (ME96SS series).
It is impossible to turn off the LCD. It is possible to turn off back lights. When any button is not pressed for 5 minutes, the automatic off mode setting... More Details >>
- No:22171
- Release Date:2018/08/27 16:41
- Update:2020/04/10 16:42
-
Branch connection for MODBUS RTU communication
No, it is impossible. But Multi-drop connection is possible. For details, refer to connection examples as below. More Details >>
- No:24808
- Release Date:2019/03/27 14:44
-
Acquired values through MODBUS RTU.
The acquired value by communication should be multiplied by the multiplying factor to change into the measurement value. Please refer to Section 7.3 of ... More Details >>
- No:22183
- Release Date:2018/08/27 16:41
- Update:2020/04/13 09:13
-
LCD COM is flashing (ME96SS series).
A reason varies with the connection situation of options. (Please refer to the section 6 of the User’s Manual.) In case of MODBUS RTU Error content: ... More Details >>
- No:22186
- Release Date:2018/08/27 16:41
- Update:2020/04/13 09:20
-
Initialization the set values (ME96SS series).
It is possible to initialize set values depending on setting. The method of initializing the setting value differs depending on the model. More Details >>
- No:22166
- Release Date:2018/08/27 16:41
- Update:2020/04/10 16:21
-
The operating/storage temperature and humidity
Storage temperature range: -25 °C to +75 °C Operating temperature range: -5 °C to +55 °C (Average: 35 °C or lower) Operating humidity range: 0% to 85% an... More Details >>
- No:22153
- Release Date:2018/08/27 16:41
- Update:2020/04/10 15:56
-
The power factor does not match the indication values through MODBUS.
Please check the register addresses. The register address for the present value of the power factor of each phase is “0789”. There are the register... More Details >>
- No:37807
- Release Date:2020/04/10 15:10
-
Communication failure with the upper system through MODBUS RTU.
Please check the following items. (A) Is the power supplied between MA and MB? (When the power is not supplied, the display does not work.) (B) Is the wir... More Details >>
- No:22182
- Release Date:2018/08/27 16:41
- Update:2020/04/10 17:08
-
Error in the measurement value (ME96SS series).
There is a possibility of the wiring error for VT/CT to this model. Please check the wiring for VT/CT and this model. More Details >>
- No:22179
- Release Date:2018/08/27 16:41
-
With ME96SS ver.B, four measurement values can be checked digitally on one screen. For models before ME96SS ver.B, up to three measured values can be checked... More Details >>
- No:37806
- Release Date:2020/04/10 15:09
1-10 of Total 57