Factory Automation

Digital transformation in factories

Platform for digital transformation in manufacturing
Security / Data Linkage / Digital Twin

Digital transformation in manufacturing requires a control platform capable of:

Secure connectivity between OT (Operational Technology)
and IT (Information Technology)

Centralized data management

System simulation and verification before actual deployment

The MX Controller is designed to meet all of these requirements,
serving as a core platform for Smart Factory architecture.

Protect systems against cyber attacks

Security is built into the control architecture — not an external add-on solution.
The MX Controller integrates security functions at the controller level, including:

Encrypted communication

User authentication

Program tampering detection
during startup

Compliance with IEC 62443-4-2
industrial security standards

Secure connectivity and data linkage with IT systems

MX Controller supports both OPC UA Server and OPC UA Client functions, enabling secure data exchange between OT and IT systems.

Server function:
Send operational data to IT systems

Device integration on one platform

Information model standardization

Support

Cloud and on-premises connectivity

Device integration on one platform

Centralized data management with Network Drive / NAS

MX Controller supports NAS storage for:

Backup file

Logging file

Recipe file

Enables:

Simultaneous updates
for multiple controllers

Long-term data storage

Fast recovery when replacing devices

Remote device monitoring

MX Controller integrates Web server functions:
Browser-based access
Support for PC, tablet, and smartphone
Monitoring without GX Works3
Enables:
CPU diagnostics monitoring
Program monitor tracking
I/O status monitoring

Mitsubishi Electric's Digital Twin

MX Controller is the core platform within Digital Twin ecosystem.

3D line simulation

Control logic simulation

Model-based development

SCADA visualization

Enables

Layout design in a virtual environment

Program verification before hardware installation

Validation of system configuration and
control logic before commissioning

Value delivered

Compliance with global
industrial standards

Standardized and secure
OT-IT connectivity

Centralized and scalable
data management

Flexible remote monitoring

Reduced development and commissioning time
through Digital Twin technology