FAQ


FAQAbout Products

- FAQ > Energy Saving Supporting Devices > Energy Saving Supporting Devices
FAQ
Keyword Search
Energy Saving Supporting Devices
FAQ within [ Energy Saving Supporting Devices ]
-
Extension of cable of the Display Unit (Model: EMU4-D65).
It is possible to extend using an extension cable (Model: EMU2-CB-T1M, EMU2-CB-T5M, EMU2-CB-T10M). Secure the total length of the extension cable is less t... More Details >>
- No:22122
- Release Date:2018/08/27 16:41
- Category: Energy Measuring Units
-
Connection failure upon one-to-one connecting a PC with EcoWebServerIII.
Please confirm as below. * Correct IP address? * Correct subnet mask? * Correct proxy setting on PC? * Correct LAN cable (no disconnection)? * Correct... More Details >>
- No:22115
- Release Date:2018/08/27 16:41
- Category: Energy Saving Data Collecting Servers
-
Sample program for CC-LINK communication (EcoMonitorPlus/EcoMonitorLight)
Sample programs are described in Programming Manual. Please refer to suitable programming manual depending on CC-Link version which you use. ・Energy Measur... More Details >>
- No:24803
- Release Date:2019/03/27 12:12
- Category: Energy Measuring Units
-
As to changing location of the decimal point and units of the measured value.
Since location of the decimal point or units of the measured value displayed is decided by Total load power, it is impossible to change location of the decim... More Details >>
- No:22139
- Release Date:2018/08/27 16:41
- Category: Energy Measuring Units
-
A dedicated Display Unit (Model: EMU4-D65) is used to set the EcoMonitorPlus (Model :EMU4-BM1-MB, EMU4-HM1-MB, EMU4-LG1-MB, EMU4-A2, EMU4-VA2, EMU4-AX4, EMU... More Details >>
- No:22128
- Release Date:2018/08/27 16:41
- Category: Energy Measuring Units
-
As to logging period of the internal memory of the main unit.
Logging period of the internal memory of the main unit as following: 1. In case of detailed data Logging period differs according to logging cycle for deta... More Details >>
- No:22137
- Release Date:2018/08/27 16:41
- Update:2018/09/07 12:43
- Category: Energy Measuring Units
-
How to measure circuits over 600A (EcoMonitorPlus / Light)
As shown in the figure below, a current transformer (CT) with a secondary current of 5A is attached to the measurement location, and a split-type current sen... More Details >>
- No:38042
- Release Date:2021/02/25 17:54
- Category: Energy Measuring Units
-
Cautions for replacing a battery (Model: EMU4-LM).
Make sure to power OFF of the EcoMonitorLight or EcoMonitorPlus when replacing a battery of the Logging Unit (Model: EMU4-LM) for the Energy Measuring Unit. ... More Details >>
- No:22125
- Release Date:2018/08/27 16:41
- Category: Energy Measuring Units
-
As to connecting an Extension Unit for an Insulation Monitor Model (Model: EMU4-LG1-MB).
Connectable. Provided that it is impossible to extend a measuring circuit for insulation monitoring. More Details >>
- No:22123
- Release Date:2018/08/27 16:41
- Category: Energy Measuring Units
-
Extension of current sensor cable (EcoMonitorPlus/Light).
Use an extension cable (Model: EMU2-CB-T1M / EMU2-CB-T5M/EMU2-CB-T10M / EMU2-CB-T1MS / EMU2-CB-T5MS / EMU2-CB-T10MS) for extending the cable between EcoMonit... More Details >>
- No:22118
- Release Date:2018/08/27 16:41
- Update:2018/09/07 11:47
- Category: Energy Measuring Units
21-30 of Total 47