FAQ


FAQAbout Products

- FAQ > Energy Saving Supporting Devices > Energy Saving Supporting Devices > Energy Measuring Units
FAQ
Keyword Search
FAQ within [ Energy Measuring Units ]
-
Setting of "Master / slave setting switch" (Model: EMU4-D65).
It is assumed that setting of "Master/Slave setting switch" at the bottom of the Display Unit (Model: EMU4-D65) for the Energy Measuring Unit is wrong. Perfo... More Details >>
- No:22126
- Release Date:2018/08/27 16:41
-
As to using SD memory card at multiple locations.
Setting different logging ID enables that one SD memory card can be used for several Logging Units. Settable logging ID is 1 to 255. More Details >>
- No:22132
- Release Date:2018/08/27 16:41
-
EcoWebServerIII's rated voltage value setting with VT connections
For 3P4W circuits, set the VT primary voltage value (between L and N). Except for 3P4W circuits, set the VT primary voltage value (between L and L). <Re... More Details >>
- No:38040
- Release Date:2021/02/25 17:54
-
Pulse magnification setting of EMU4-PX4(Pulse Input Unit)
Match the setting values with EMU4-PX4 and EcoWebServerIII. No need to consider one-cycle operation because it is automatically calculated in EcoWebServerII... More Details >>
- No:38041
- Release Date:2021/02/25 17:54
-
Sample program for MODBUS RTU communication(EcoMonitorPlus/EcoMonitorLight)
Sample programs are described in Programming Manual. Please refer to MODBUS Interface specifications (LSPY-9025) and MODBUS Interface soecifications(LSPY-9... More Details >>
- No:24806
- Release Date:2019/03/27 12:12
-
Simultaneous data acquisition of MODBUS RTU communication and Optional Unit.
It is possible to simultaneously collect data by MODBUS RTU communication and Optional Unit connected. Provided that MODBUS RTU communication cannot collec... More Details >>
- No:22140
- Release Date:2018/08/27 16:41
-
How to measure circuits over 600A (EcoMonitorPlus / Light)
As shown in the figure below, a current transformer (CT) with a secondary current of 5A is attached to the measurement location, and a split-type current sen... More Details >>
- No:38042
- Release Date:2021/02/25 17:54
-
Error No.001(EcoMonitorPlus, EcoMonitorLight)
Error "No. 001" means start failure of CC-Link communication unit. Please try either step. Solution: ・Press and hold the reset button of CC-Link communica... More Details >>
- No:24810
- Release Date:2019/03/27 14:44
-
Branch connection for MODBUS RTU communication
No, it is impossible. But Multi-drop connection is possible. For details, refer to connection examples as below. More Details >>
- No:24808
- Release Date:2019/03/27 14:44
-
As to changing location of the decimal point and units of the measured value.
Since location of the decimal point or units of the measured value displayed is decided by Total load power, it is impossible to change location of the decim... More Details >>
- No:22139
- Release Date:2018/08/27 16:41
1-10 of Total 36