FAQ


FAQAbout Products

- FAQ > Energy Saving Supporting Devices > Energy Saving Supporting Devices > Energy Measuring Units
FAQ
Keyword Search
FAQ within [ Energy Measuring Units ]
-
Setting of "Master / slave setting switch" (Model: EMU4-D65).
It is assumed that setting of "Master/Slave setting switch" at the bottom of the Display Unit (Model: EMU4-D65) for the Energy Measuring Unit is wrong. Perfo... More Details >>
- No:22126
- Release Date:2018/08/27 16:41
-
As to indication of the measurement value of the electric energy (EcoMonitorPlus/Light).
It measures from 0kWh(MWh) after going round. Integer 4 digits : 9999.98→9999.99→0000.00→0000.01kWh(MWh) Integer 5 digits : 99999.8→99999.9→00000.0→0000... More Details >>
- No:22131
- Release Date:2018/08/27 16:41
-
Branch connection for MODBUS RTU communication
No, it is impossible. But Multi-drop connection is possible. For details, refer to connection examples as below. More Details >>
- No:24808
- Release Date:2019/03/27 14:44
-
As to periodic electric energy (EcoMonitorPlus/Light).
It means an integrated electric energy (consumption) while an external input (contact input) is ON. It is a measurement element different from the electric... More Details >>
- No:22124
- Release Date:2018/08/27 16:41
-
As to logging period of the optional SD memory card (EMU4-SD2GB).
Logging period of the optional SD memory card (EMU4-SD2GB) is according to the logging cycle of detail data and the number of measuring circuits. * It is ... More Details >>
- No:22136
- Release Date:2018/08/27 16:41
- Update:2018/09/07 12:48
-
Error No.001(EcoMonitorPlus, EcoMonitorLight)
Error "No. 001" means start failure of CC-Link communication unit. Please try either step. Solution: ・Press and hold the reset button of CC-Link communica... More Details >>
- No:24810
- Release Date:2019/03/27 14:44
-
Cause of "minus" indication for electric power value (EcoMonitorPlus/Light).
Following causes are assumed for the error. 1. Wrong orientation of the sensor? 2. 1-side and 3-side of the sensor are reversed? 3. Is connection betwe... More Details >>
- No:22143
- Release Date:2018/08/27 16:41
-
As to timing for outputting data file into the SD memory card.
EMU4-LM outputs data file at following timing. 1. When inserting the SD memory card while operating. 2. When power is ON in a state of the SD memory ca... More Details >>
- No:22133
- Release Date:2018/08/27 16:41
-
How to measure circuits over 600A (EcoMonitorPlus / Light)
As shown in the figure below, a current transformer (CT) with a secondary current of 5A is attached to the measurement location, and a split-type current sen... More Details >>
- No:38042
- Release Date:2021/02/25 17:54
-
As to compensation for power failure (EcoMonitorPlus/Light).
Since the setting value, integrated value (electric energy (consumption, regeneration), reactive energy, periodic electric energy, pulse count and operating ... More Details >>
- No:22141
- Release Date:2018/08/27 16:41
1-10 of Total 36