FAQ


FAQAbout Products

- FAQ > Energy Saving Supporting Devices > Energy Saving Supporting Devices > Energy Measuring Units
FAQ
Keyword Search
FAQ within [ Energy Measuring Units ]
-
Setting of "Master / slave setting switch" (Model: EMU4-D65).
It is assumed that setting of "Master/Slave setting switch" at the bottom of the Display Unit (Model: EMU4-D65) for the Energy Measuring Unit is wrong. Perfo... More Details >>
- No:22126
- Release Date:2018/08/27 16:41
-
Branch connection for MODBUS RTU communication
No, it is impossible. But Multi-drop connection is possible. For details, refer to connection examples as below. More Details >>
- No:24808
- Release Date:2019/03/27 14:44
-
Pulse magnification setting of EMU4-PX4(Pulse Input Unit)
Match the setting values with EMU4-PX4 and EcoWebServerIII. No need to consider one-cycle operation because it is automatically calculated in EcoWebServerII... More Details >>
- No:38041
- Release Date:2021/02/25 17:54
-
As to connecting an Extension Unit for an Insulation Monitor Model (Model: EMU4-LG1-MB).
Connectable. Provided that it is impossible to extend a measuring circuit for insulation monitoring. More Details >>
- No:22123
- Release Date:2018/08/27 16:41
-
As to logging after removing an SD memory card.
Since the EMU4-LM performs data logging, it is possible to log the data even in a state of removing the SD memory card. Provided that the period for data l... More Details >>
- No:22134
- Release Date:2018/08/27 16:41
-
Extension of cable of the Display Unit (Model: EMU4-D65).
It is possible to extend using an extension cable (Model: EMU2-CB-T1M, EMU2-CB-T5M, EMU2-CB-T10M). Secure the total length of the extension cable is less t... More Details >>
- No:22122
- Release Date:2018/08/27 16:41
-
Error No.001(EcoMonitorPlus, EcoMonitorLight)
Error "No. 001" means start failure of CC-Link communication unit. Please try either step. Solution: ・Press and hold the reset button of CC-Link communica... More Details >>
- No:24810
- Release Date:2019/03/27 14:44
-
As to logging period of the internal memory of the main unit.
Logging period of the internal memory of the main unit as following: 1. In case of detailed data Logging period differs according to logging cycle for deta... More Details >>
- No:22137
- Release Date:2018/08/27 16:41
- Update:2018/09/07 12:43
-
EcoWebServerIII's rated voltage value setting with VT connections
For 3P4W circuits, set the VT primary voltage value (between L and N). Except for 3P4W circuits, set the VT primary voltage value (between L and L). <Re... More Details >>
- No:38040
- Release Date:2021/02/25 17:54
-
As to compensation for power failure of Logging Unit for the Energy Measuring Unit.
Since the setting value is stored into nonvolatile memory, it will not be lost. The clock, logging data and system log data are retained as long as a batter... More Details >>
- No:22138
- Release Date:2018/08/27 16:41
- Update:2018/09/07 13:07
1-10 of Total 36