FAQ


FAQAbout Products

- FAQ > Energy Saving Supporting Devices > Energy Saving Supporting Devices > Energy Measuring Units
FAQ
Keyword Search
FAQ within [ Energy Measuring Units ]
-
Setting of "Master / slave setting switch" (Model: EMU4-D65).
It is assumed that setting of "Master/Slave setting switch" at the bottom of the Display Unit (Model: EMU4-D65) for the Energy Measuring Unit is wrong. Perfo... More Details >>
- No:22126
- Release Date:2018/08/27 16:41
-
As to indication of the measurement value of the electric energy (EcoMonitorPlus/Light).
It measures from 0kWh(MWh) after going round. Integer 4 digits : 9999.98→9999.99→0000.00→0000.01kWh(MWh) Integer 5 digits : 99999.8→99999.9→00000.0→0000... More Details >>
- No:22131
- Release Date:2018/08/27 16:41
-
As to logging period of the optional SD memory card (EMU4-SD2GB).
Logging period of the optional SD memory card (EMU4-SD2GB) is according to the logging cycle of detail data and the number of measuring circuits. * It is ... More Details >>
- No:22136
- Release Date:2018/08/27 16:41
- Update:2018/09/07 12:48
-
Branch connection for MODBUS RTU communication
No, it is impossible. But Multi-drop connection is possible. For details, refer to connection examples as below. More Details >>
- No:24808
- Release Date:2019/03/27 14:44
-
Error No.001(EcoMonitorPlus, EcoMonitorLight)
Error "No. 001" means start failure of CC-Link communication unit. Please try either step. Solution: ・Press and hold the reset button of CC-Link communica... More Details >>
- No:24810
- Release Date:2019/03/27 14:44
-
As to periodic electric energy (EcoMonitorPlus/Light).
It means an integrated electric energy (consumption) while an external input (contact input) is ON. It is a measurement element different from the electric... More Details >>
- No:22124
- Release Date:2018/08/27 16:41
-
As to timing for outputting data file into the SD memory card.
EMU4-LM outputs data file at following timing. 1. When inserting the SD memory card while operating. 2. When power is ON in a state of the SD memory ca... More Details >>
- No:22133
- Release Date:2018/08/27 16:41
-
EcoWebServerIII's rated voltage value setting with VT connections
For 3P4W circuits, set the VT primary voltage value (between L and N). Except for 3P4W circuits, set the VT primary voltage value (between L and L). <Re... More Details >>
- No:38040
- Release Date:2021/02/25 17:54
-
Simultaneous data acquisition of MODBUS RTU communication and Optional Unit.
It is possible to simultaneously collect data by MODBUS RTU communication and Optional Unit connected. Provided that MODBUS RTU communication cannot collec... More Details >>
- No:22140
- Release Date:2018/08/27 16:41
-
As to compensation for power failure (EcoMonitorPlus/Light).
Since the setting value, integrated value (electric energy (consumption, regeneration), reactive energy, periodic electric energy, pulse count and operating ... More Details >>
- No:22141
- Release Date:2018/08/27 16:41
1-10 of Total 36