FAQ


FAQAbout Products

- FAQ > Controllers > Programmable Controllers MELSEC > MELSEC-F Series > Main Unit
FAQ
Keyword Search
FAQ within [ Main Unit ]
-
Models of the MELSEC-F series main units
"E" represents AC power supply and "D" represents DC power supply. The alphabets following "E" and "D" represent output types. "S" represents replay output... More Details >>
- No:24776
- Release Date:2019/02/27 15:35
-
How to check the scan time (MELSEC-F series)
The present scan time is stored in D8010. Monitor the valueusing a programming tool such as GX Works2 and GX Developer. More Details >>
- No:24685
- Release Date:2019/02/22 11:40
- Update:2019/02/22 15:07
-
The power supply lamp of a running programmable controller suddenly turned off or flashes
Check whether the lamp is back to normalafter disconnecting the wiring of the "24V" (service power supply) terminal. Ifthe lamp is back to normal,the servic... More Details >>
- No:22267
- Release Date:2018/08/30 13:48
- Update:2019/02/19 11:53
-
The station number setting is not required for non-protocol communication. More Details >>
- No:24948
- Release Date:2019/04/18 14:27
-
CF cards that can be used in the FX3U-CF-ADP
The CF cards, whose operations are guaranteed, are the following five models manufactured by Mitsubishi Electric. GT05-MEM-128MC, GT05-MEM-256MC, GT05-MEM-5... More Details >>
- No:24945
- Release Date:2019/04/18 14:26
-
Data collection with FX programmable controller
Data stored in the programmable controller can be saved to a CF card usinga FX3U-CF-ADP CF card special adapter for the FX3U/FX3UC series. More Details >>
- No:24936
- Release Date:2019/04/18 14:24
-
Adding two channels of the RS-232C port in the FX3G series
Select the 40-point or 60-point type FX3G series main unit. In this case, two FX3G-232-BDs can be connected. When FX3G-CNV-ADP is used, anFX3U-232ADP can be ... More Details >>
- No:24926
- Release Date:2019/04/17 11:42
-
Power supply cable of the input extension blocks for the connector type programmable controllers
Forthe first input extension block connecting to a main unit, use the FX2NC-100BPCB power supply cable provided with the main unit, and supply power from a 2... More Details >>
- No:24911
- Release Date:2019/04/15 11:32
-
Scan time while operation of a programmable controller CPU is being monitored using GX Works2
Scan time displayed on GX Works2 is the maximum scan time of the monitor target programmable controller CPU. To check current scan time, monitor the data in... More Details >>
- No:24779
- Release Date:2019/02/27 15:58
-
All input COM terminals send the same signal because all the terminals are internally connected. To turn on the input, the extension unit must be connected ... More Details >>
- No:22274
- Release Date:2018/08/30 13:48
61-70 of Total 126