FAQ


FAQAbout Products
- FAQ > Controllers > Programmable Controllers MELSEC > MELSEC-F Series > Network/Communication
FAQ
Keyword Search
FAQ within [ Network/Communication ]
-
MC protocol supported by the FX3U-ENET-L
The frame typesupported byMC protocol is equivalent to A-compatible 1E frame. More Details >>
- No:24702
- Release Date:2019/02/27 08:59
-
The slave stations cannot be assigned to X/Y numbers. Use the auxiliary relay M. More Details >>
- No:24982
- Release Date:2019/04/23 07:21
-
The FX2N-16CCL-M cannot be set as the master station in the parameter setting. Use the FROM/TO instructions and setin the program. More Details >>
- No:25001
- Release Date:2019/04/23 10:39
-
Maximum number of personal computers that can be communicated with the FX3U-ENET-L simultaneously
For communications using MELSOFT connection, such as GX Developer, GX Works2, GOT1000, and MX Component, up to two personal computers can be used. In additi... More Details >>
- No:24920
- Release Date:2019/04/17 11:41
-
One FX3U-ENET-ADP can be connected at the last stage (left end) of adapters for the FX3GC series. * The FX3U-ENET-ADP is a communication special adapter and... More Details >>
- No:24967
- Release Date:2019/04/23 07:18
-
Communication setting methods when the FX3U-232-BD is used
The non-protocol communication can be set by the following two methods: (1) setting parameters using a programming tool, such as GX Works2, or (2) writing da... More Details >>
- No:24773
- Release Date:2019/02/27 15:24
-
Certificate of non-applicability to export MELSEC-F to other countries
For issuance of a certificate, please consult your local Mitsubishi representative. More Details >>
- No:22264
- Release Date:2018/08/30 13:48
-
Using the inverter communication instruction in FX3G series
It can be used in the FX3G series main units with Ver. 1.10 or later. More Details >>
- No:24961
- Release Date:2019/04/23 07:17
-
Compliance of the FX programmable controllers with the EU RoHS Directive
Most of the existing programmable controllers are compliant with the EU RoHS Directive. For details, please consult your local Mitsubishi Electric representa... More Details >>
- No:24888
- Release Date:2019/04/15 08:07
-
Necessity for installing a noise filter
Unless the necessity is described in manuals, a noise filter is not required. However, if the programmable controller is used in an environment with much no... More Details >>
- No:22283
- Release Date:2018/08/30 13:48
31-40 of Total 43