Start main contents

Factory Automation

FAQ

Factory Automation

FAQAbout Products

  • Font Size
  • S
  • M
  • L

FAQ within [ Options ]

1-10 of Total 127

prev 1 / 13page next
  • FR-RC

    Pr.30 = "1" and Pr.70 = "0". More Details >>

    • No:21143
    • Release Date:2018/08/22 16:26
  • FR-HAL

    □□□□□□ Year Month (Control number) The last digit of the manufactured year is indicated as the Year, and the Month is indicated by 2 to 9, X (October), Y (No... More Details >>

    • No:20984
    • Release Date:2018/08/22 16:25
  • FR-BLF

    □□□□□□ Year Month (Control number) The last digit of the manufactured year is indicated as the Year, and the Month is indicated by (A → B → C... ⇒ January → ... More Details >>

    • No:20983
    • Release Date:2018/08/22 16:25
  • FR-BSF-01

    □□□□□□ Year Month (Control number) The last digit of the production year is indicated as the Year, and the Month is indicated by 1 to 9, X (October), Y (Nove... More Details >>

    • No:20982
    • Release Date:2018/08/22 16:25
  • Installation necessity of a DC reactor

    A DC reactor connection is required under the following conditions. - Inverter capacity is 75K or higher - Motor capacity is 75 kW or higher. If any of the a... More Details >>

    • No:21077
    • Release Date:2018/08/22 16:25
  • FR-PA07

    No, it cannot. The standard operation panel (FR-DU08) can be connected to the face of the board by using the FR-ADP (operation panel connection connector) an... More Details >>

    • No:20898
    • Release Date:2018/08/22 16:24
  • Brake unit selection

    1. The BU brake unit does not have the fault output.Multiple BU brake units can be connected in parallel.2. Power supply voltage 480 V- What resistance value... More Details >>

    • No:21930
    • Release Date:2018/08/22 16:30
  • Parameter unit

    The FR-PU07(BB) can be used with some restrictions.* The major restrictions are as follows. - Pr.1000 or later cannot be set. - Alarms or warnings that are a... More Details >>

    • No:21119
    • Release Date:2018/08/22 16:26
  • DC reactor

    If using an inverter with capacity of 75K or higher, or motor with capacity of 75 kW or higher, always select and install the inverter based on the capacity ... More Details >>

    • No:21112
    • Release Date:2018/08/22 16:25
  • FR-LU08

    Approximately 2 years when the FR-LU08 is not energized and the real-time clock function is enabled. More Details >>

    • No:21084
    • Release Date:2018/08/22 16:25

1-10 of Total 127

Inquiries