Start main contents

Factory Automation

FAQ

Factory Automation

FAQAbout Products

  • Font Size
  • S
  • M
  • L

FAQ within [ FREQROL-A800 ]

41-50 of Total 142

prev 5 / 15page next
  • Combination of the FR-A800 and MM-BF

    Select the models so that "MM - BF rated current value × 1.05 < FR-A820 rated output current value". More Details >>

    • No:21000
    • Release Date:2018/08/22 16:25
  • PLC function

    It is 1 s interval. More Details >>

    • No:21055
    • Release Date:2018/08/22 16:25
  • FR-A800

    Number of terminals: Same input terminals as the A700 series, and the following two terminals are added. Safety: SI1, SI2, SIC 24 V power supply: +24 * The t... More Details >>

    • No:21099
    • Release Date:2018/08/22 16:25
  • DC reactor

    It can be used since the specifications are the same. Note that the warranty period and expected lifespan for the A700/F700P are inherited. More Details >>

    • No:21092
    • Release Date:2018/08/22 16:25
  • Sine wave filter

    The sine wave filter can be applied only under V/F control. When Pr.72 PWM frequency selection is set to 25, V/F control is set automatically. The applicable... More Details >>

    • No:21068
    • Release Date:2018/08/22 16:25
  • Model

    LD is not supported, however, SLD is supported. More Details >>

    • No:21054
    • Release Date:2018/08/22 16:25
  • FR-A800-R2R

    They cannot be set with the frequency. Because the command is input at the line speed, consider the line speed of the initial winding diameter at 20 Hz. The ... More Details >>

    • No:20888
    • Release Date:2018/08/22 16:24
  • Wiring length

    In the FR-A800/F800, the restriction on the wiring length of the shielded cable is eliminated. The wiring length is up to 500 m as is the case with the unshi... More Details >>

    • No:21089
    • Release Date:2018/08/22 16:25
  • FR-LU08

    Approximately 2 years when the FR-LU08 is not energized and the real-time clock function is enabled. More Details >>

    • No:21084
    • Release Date:2018/08/22 16:25
  • Installation necessity of a DC reactor

    A DC reactor connection is required under the following conditions. - Inverter capacity is 75K or higher - Motor capacity is 75 kW or higher. If any of the a... More Details >>

    • No:21077
    • Release Date:2018/08/22 16:25

41-50 of Total 142

Inquiries