Start main contents

Factory Automation

FAQ

Factory Automation

FAQAbout Products

  • Font Size
  • S
  • M
  • L

FAQ within [ FREQROL-F800 ]

11-20 of Total 89

prev 2 / 9page next
  • DC reactor

    If using an inverter with capacity of 75K or higher, or motor with capacity of 75 kW or higher, always select and install the inverter based on the capacity ... More Details >>

    • No:21112
    • Release Date:2018/08/22 16:25
  • Use of the DC reactor

    It can be used in terms of the specifications. However, it is recommended to update the reactor and inverter at the same time because the DC reactor was manu... More Details >>

    • No:21017
    • Release Date:2018/08/22 16:25
  • Life measurement of the main circuit capacitor

    No. Turn OFF and ON both main circuit and control circuit. More Details >>

    • No:20999
    • Release Date:2018/08/22 16:25
  • FR-PU07

    No. They can be connected with the connection cable (FR-CB20[]). [] indicates cable length (1 m, 3 m, 5 m). More Details >>

    • No:21081
    • Release Date:2018/08/22 16:25
  • Parameter unit

    The FR-PU07(BB) can be used with some restrictions.* The major restrictions are as follows. - Pr.1000 or later cannot be set. - Alarms or warnings that are a... More Details >>

    • No:21119
    • Release Date:2018/08/22 16:26
  • FR-LU08

    Approximately 2 years when the FR-LU08 is not energized and the real-time clock function is enabled. More Details >>

    • No:21084
    • Release Date:2018/08/22 16:25
  • 24 VDC power supply

    Power is supplied only to the control power supply, and thus this enables communication, parameter setting through the operation panel or an USB memory devic... More Details >>

    • No:21097
    • Release Date:2018/08/22 16:25
  • Operation mode switch of the FR-A800/F800

    When Pr.551 is set to "3" (Command right to the USB connector at the PU operation), or when the USB is connected, the operation is not switched. More Details >>

    • No:20861
    • Release Date:2018/08/22 16:24
  • Wiring length

    In the FR-A800/F800, the restriction on the wiring length of the shielded cable is eliminated. The wiring length is up to 500 m as is the case with the unshi... More Details >>

    • No:21089
    • Release Date:2018/08/22 16:25
  • Installation necessity of a DC reactor

    A DC reactor connection is required under the following conditions. - Inverter capacity is 75K or higher - Motor capacity is 75 kW or higher. If any of the a... More Details >>

    • No:21077
    • Release Date:2018/08/22 16:25

11-20 of Total 89

Inquiries