Start main contents

Factory Automation

FAQ

Factory Automation

FAQAbout Products

  • Font Size
  • S
  • M
  • L

FAQ within [ FREQROL-F800 ]

41-50 of Total 89

prev 5 / 9page next
  • Carrier frequency automatic reducing function

    The function operates immediately when the current of 85% or higher flows. The limit is canceled when the current becomes 80% or lower. More Details >>

    • No:20903
    • Release Date:2018/08/22 16:25
  • Communication specifications for connection of multiple inverters

    Use the RS485 terminal for the multiple communication of the A series/F series inverters.* Communication with the PU connector is only one-to-one connection. More Details >>

    • No:20998
    • Release Date:2018/08/22 16:25
  • Front cover

    Parts arrangement is available. Consult with your sales agent. More Details >>

    • No:21012
    • Release Date:2018/08/22 16:25
  • Wiring length

    In the FR-A800/F800, the restriction on the wiring length of the shielded cable is eliminated. The wiring length is up to 500 m as is the case with the unshi... More Details >>

    • No:21089
    • Release Date:2018/08/22 16:25
  • USB

    The mini B connector is used for connecting with FR Configurator2. A USB memory device can be connected to the A connector (host) to save parameters or trace... More Details >>

    • No:21095
    • Release Date:2018/08/22 16:25
  • PLC function

    The processing speed, scan time, and others are slower than those of the programmable controllers. There are some restrictions in the number of I/O points, p... More Details >>

    • No:21103
    • Release Date:2018/08/22 16:25
  • Plug-in options

    The conventional plug-in option (FR-A7[][]) cannot be used. Use the dedicated plug-in option (FR-A8[][]). More Details >>

    • No:21114
    • Release Date:2018/08/22 16:25
  • FR-A800/FR-F800

    When only the main circuit input power supply is cut off with the MC (when the power supply shutoff time is long), the main circuit undervoltage or instantan... More Details >>

    • No:20833
    • Release Date:2018/08/22 16:24
  • CC-Link IE Field Basic

    Up to 64 (slave stations). The number of connectable units differs depending on the master station. More Details >>

    • No:20857
    • Release Date:2018/08/22 16:24
  • CC-Link IE Field Basic

    Only the FR-A800/F800-E series is supported by CC-Link IE Field Basic. (As of March 2017) The FR-A800-GF and FR-A8NCE supported by CC-Link IE Field are not s... More Details >>

    • No:20858
    • Release Date:2018/08/22 16:24

41-50 of Total 89

Inquiries