Start main contents

Factory Automation

FAQ

Factory Automation

FAQAbout Products

  • Font Size
  • S
  • M
  • L

FAQ within [ FREQROL-F800 ]

71-80 of Total 89

prev 8 / 9page next
  • SW1DND-FRC2 (FR Configurator2)

    Check the setting value of Pr.414 (PLC function operation selection) and if the initial value: 0 (PLC function disabled) is set, set "1" or "2" and enable th... More Details >>

    • No:21080
    • Release Date:2018/08/22 16:25
  • FR-PU07

    No. They can be connected with the connection cable (FR-CB20[]). [] indicates cable length (1 m, 3 m, 5 m). More Details >>

    • No:21081
    • Release Date:2018/08/22 16:25
  • FR-PA07

    No, it cannot. The standard operation panel (FR-DU08) can be connected to the face of the board by using the FR-ADP (operation panel connection connector) an... More Details >>

    • No:20898
    • Release Date:2018/08/22 16:24
  • Life measurement of the main circuit capacitor

    No. Turn OFF and ON both main circuit and control circuit. More Details >>

    • No:20999
    • Release Date:2018/08/22 16:25
  • Copy function

    No. (Using the copy function causes an error.) Use the FR-DU08 when performing the copy function of the operation panel. More Details >>

    • No:21118
    • Release Date:2018/08/22 16:26
  • Parameter unit

    The FR-PU07(BB) can be used with some restrictions.* The major restrictions are as follows. - Pr.1000 or later cannot be set. - Alarms or warnings that are a... More Details >>

    • No:21119
    • Release Date:2018/08/22 16:26
  • Undervoltage warning

    The undervoltage warning of the inverter is judged based on the voltage of the main circuit as follows. Power failure only at the main circuit: Output an und... More Details >>

    • No:20853
    • Release Date:2018/08/22 16:24
  • PLC function

    Vector control: The SM1217 turns ON when the motor rotates even if no forward rotation command is send. Other than vector control: The SM1217 turn ON by forw... More Details >>

    • No:20907
    • Release Date:2018/08/22 16:25
  • FR-A800-E

    The direct connection with the inverter like the standard model, and the connection via the GOT and relay station (programmable controller) are available. On... More Details >>

    • No:20879
    • Release Date:2018/08/22 16:24
  • Installation necessity of a DC reactor

    A DC reactor connection is required under the following conditions. - Inverter capacity is 75K or higher - Motor capacity is 75 kW or higher. If any of the a... More Details >>

    • No:21077
    • Release Date:2018/08/22 16:25

71-80 of Total 89

Inquiries