FAQ


FAQAbout Products
- FAQ > Drive Products > Inverters-FREQROL > FREQROL-F800
FAQ
Keyword Search
FAQ within [ FREQROL-F800 ]
-
It can be used in terms of the specifications. However, it is recommended to update the reactor and inverter at the same time because the DC reactor was manu... More Details >>
- No:21017
- Release Date:2018/08/22 16:25
-
Power is supplied only to the control power supply, and thus this enables communication, parameter setting through the operation panel or an USB memory devic... More Details >>
- No:21097
- Release Date:2018/08/22 16:25
-
Yes, they are the same. More Details >>
- No:21010
- Release Date:2018/08/22 16:25
-
Up to 64 (slave stations). The number of connectable units differs depending on the master station. More Details >>
- No:20857
- Release Date:2018/08/22 16:24
-
Residual voltage at the output shutoff
The rotation speed has almost no effect. The residual voltage increases when the torque boost is increased, but no adjustment is required. More Details >>
- No:20906
- Release Date:2018/08/22 16:25
-
The number of terminals: There are the same input terminals as F700P and the following terminals (4 points) are added. Safety: SI1, SI2, SIC 24 V power suppl... More Details >>
- No:21070
- Release Date:2018/08/22 16:25
-
Only the FR-A800/F800-E series is supported by CC-Link IE Field Basic. (As of March 2017) The FR-A800-GF and FR-A8NCE supported by CC-Link IE Field are not s... More Details >>
- No:20858
- Release Date:2018/08/22 16:24
-
No. They can be connected with the connection cable (FR-CB20[]). [] indicates cable length (1 m, 3 m, 5 m). More Details >>
- No:21081
- Release Date:2018/08/22 16:25
-
When it is required to keep the safety of the inverter and the system against unauthorized access from external devices via the network, take countermeasures... More Details >>
- No:20883
- Release Date:2018/08/22 16:24
81-89 of Total 89