Start main contents

Factory Automation

FAQ

Factory Automation

FAQAbout Products

  • Font Size
  • S
  • M
  • L

FAQ within [ FREQROL-E700 ]

111-120 of Total 393

prev 12 / 40page next
  • Terminal CS

    FR-E700, D700, and F700PJ do not have the terminal CS and you can only control automatic restart by setting Pr.57 (Restart coasting time). More Details >>

    • No:21707
    • Release Date:2018/08/22 16:29
  • 10 VDC voltage from terminal 10

    Setting Pr.73 to "0" does not generate 10 VDC output.The inverter itself only has 5 V at the terminal 10.Setting this parameter to "0" allows 10 V input betw... More Details >>

    • No:21727
    • Release Date:2018/08/22 16:29
  • FR-PA07

    1. Press the PU/EXT key on the operation panel FR-PA07 to choose the PU operation mode. Set Pr.161 (Frequency setting/key lock operation selection) to "1" an... More Details >>

    • No:21761
    • Release Date:2018/08/22 16:29
  • Transistor output module of the programmable controller

    Check if signals that are ON when the programmable controller's transistor output starts are always ON. More Details >>

    • No:21811
    • Release Date:2018/08/22 16:29
  • CC-Link

    You cannot monitor the running frequency and conveyor speed (machine speed) simultaneously.The inverter does not have a function to output them simultaneously. More Details >>

    • No:21827
    • Release Date:2018/08/22 16:29
  • CC-Link

    You can use optional items, such as enclosure surface operation panel FR-PA07 and parameter unit FR-PU07.Use the PU connector of the inverter for connection.... More Details >>

    • No:21832
    • Release Date:2018/08/22 16:29
  • CC-Link

    If Pr.340 (Communication startup mode selection) and Pr.79 (Operation mode selection) are set so that the inverter starts CC-Link operation from power-on and... More Details >>

    • No:21840
    • Release Date:2018/08/22 16:29
  • Supported model for FR-Configurator

    For the models other than FR-A700/F700, use FR-Configurator (FR-SW3-SETUP-WJ). They are not supported by FR-Configurator (FR-SW2-SETUP-WJ). When you have the... More Details >>

    • No:21313
    • Release Date:2018/08/22 16:26
  • FR-PA02

    The operation panel FR-PA02 requires the optional FR-E5P (control panel rear cover and adapter set) and connection cable FR-CB20□. Check that Pr.146 (Built-i... More Details >>

    • No:21367
    • Release Date:2018/08/22 16:27
  • Network operation

    Yes. With the setting "66", you can choose NET operation when X66 is ON, and external operation when X66 is OFF. More Details >>

    • No:21675
    • Release Date:2018/08/22 16:28

111-120 of Total 393

Inquiries