Start main contents

Factory Automation

FAQ

Factory Automation

FAQAbout Products

  • Font Size
  • S
  • M
  • L

FAQ within [ FREQROL-E700 ]

121-130 of Total 394

prev 13 / 40page next
  • Programmable controller

    The error LED on the master side of the programmable controller blinks (faulty station present).According to the SW80 station information, an error flag is a... More Details >>

    • No:21813
    • Release Date:2018/08/22 16:29
  • Changing the control method

    Set Pr.71 (Applied motor), Pr.80 (Motor capacity), Pr.81 (Number of motor poles), and Pr.800 (Control method selection). More Details >>

    • No:21245
    • Release Date:2018/08/22 16:26
  • CC-Link

    When configuring the inverter via communication such as CC-Link, some signals still requires to be input from the external terminals.(Terminal OH: External t... More Details >>

    • No:21888
    • Release Date:2018/08/22 16:29
  • CC-Link

    You can select deceleration stop by setting Pr.502 (Stop mode selection at communication error). (Select from coasting to stop, deceleration to stop, and con... More Details >>

    • No:21892
    • Release Date:2018/08/22 16:29
  • CC-Link

    For the inverter, the option card FR-A7NC is necessary.   More Details >>

    • No:21897
    • Release Date:2018/08/22 16:29
  • Brake resistor

    The brake unit can be installed. FR-BU2-1.5K and GZG300W50 ? can be used in combination. More Details >>

    • No:21332
    • Release Date:2018/08/22 16:27
  • CC-Link

    1. It depends on how Pr.338 (Communication operation command source) and Pr.339 (Communication speed command source) are set.2. The external terminal reset i... More Details >>

    • No:21838
    • Release Date:2018/08/22 16:29
  • Operation panel and FR-PA07

    Since the operation panel and PU connector cannot be specified for command source at the same time, they cannot be used together. More Details >>

    • No:21349
    • Release Date:2018/08/22 16:27
  • FR-PA07

    Only the operation command source is switched to the FR-A07 and the inverter operation panel does not turn off. (Setting from the inverter operation panel be... More Details >>

    • No:21699
    • Release Date:2018/08/22 16:28
  • CC-Link

    If you are using CC-Link just to monitor the inverter and using the analog signal and multi-speed setting to set the frequency, you need to input them extern... More Details >>

    • No:21900
    • Release Date:2018/08/22 16:29

121-130 of Total 394

Inquiries