Start main contents

Factory Automation

FAQ

Factory Automation

FAQAbout Products

  • Font Size
  • S
  • M
  • L

FAQ within [ FREQROL-E700 ]

221-230 of Total 393

prev 23 / 40page next
  • Proportional band of multiple inverters

    By importing the operation frequency from the AM terminal (analog output) of the first inverter to the FR-FH (ratio setter), the operation command which is p... More Details >>

    • No:21250
    • Release Date:2018/08/22 16:26
  • CC-Link

    You can start/stop operation, set the frequency, read/write parameters, and monitor the inverter via CC-Link communication. More Details >>

    • No:21901
    • Release Date:2018/08/22 16:29
  • CC-Link

    You can use the CC-Link type programming example for the FR-E500 as a reference.In the programming example for the FR-E500, the A series programmable control... More Details >>

    • No:21836
    • Release Date:2018/08/22 16:29
  • Maximum frequency

    If you try to change a parameter in other than the PU operation mode, the mode specification error "Er4" may occur.Set the parameters in the PU operation mod... More Details >>

    • No:21778
    • Release Date:2018/08/22 16:29
  • Motor specifications setting

    Yes.Set Pr.19 (Base frequency voltage) to "200 V".200 V output will be obtained during 60 Hz operation. More Details >>

    • No:21717
    • Release Date:2018/08/22 16:29
  • FR-Configurator

    No. You cannot connect it to multiple inverters.You can only connect a single personal computer to a single inverter via USB. More Details >>

    • No:21710
    • Release Date:2018/08/22 16:29
  • Input phase loss

    The FR-E700, D700, F700PJ may activate input phase loss protection "E.ILF" if the phase-to-phase voltage of the power supply has become largely unbalanced. More Details >>

    • No:21339
    • Release Date:2018/08/22 16:27
  • CC-Link

    Check if the CC-Link wires are short-circuited and/or station numbers are duplicated.   More Details >>

    • No:21891
    • Release Date:2018/08/22 16:29
  • Frequency setting

    You can use the setting dial together with the terminal 4.Set Pr.79 (Operation mode) to "3" (Combined operation mode) and assign the AU signal to an unused t... More Details >>

    • No:21856
    • Release Date:2018/08/22 16:29
  • CC-Link communication

    After setting Pr.79 (Operation mode selection) to "2" and Pr.340 (Communication startup mode selection) to "10", reset the inverter (or power ON again) to st... More Details >>

    • No:21256
    • Release Date:2018/08/22 16:26

221-230 of Total 393

Inquiries