Start main contents

Factory Automation

FAQ

Factory Automation

FAQAbout Products

  • Font Size
  • S
  • M
  • L

FAQ within [ FREQROL-E700 ]

231-240 of Total 393

prev 24 / 40page next
  • CC-Link

    You can start/stop operation, set the frequency, read/write parameters, and monitor the inverter via CC-Link communication. More Details >>

    • No:21901
    • Release Date:2018/08/22 16:29
  • CC-Link

    The way to monitor the output current and read parameters via CC-Link is identical in all operation modes.  More Details >>

    • No:21872
    • Release Date:2018/08/22 16:29
  • Frequency setting

    Since the percent value read by the calibration parameter C7 indicates that the voltage of 10 V is internally detected as 101.0%, use 101.0% as is.If you cha... More Details >>

    • No:21740
    • Release Date:2018/08/22 16:29
  • External terminal

    1. Use the external terminals STF, RL, and SD. (A push-ON switch for operation is required between the terminals STF and SD, and a push-OFF switch is require... More Details >>

    • No:21816
    • Release Date:2018/08/22 16:29
  • Programmable controller

    The error LED on the master side of the programmable controller blinks (faulty station present).According to the SW80 station information, an error flag is a... More Details >>

    • No:21813
    • Release Date:2018/08/22 16:29
  • Frequency setting

    You cannot calibrate the frequency around the middle of the current input range.The inverter determines the top and bottom points in the bias/gain adjustment... More Details >>

    • No:21736
    • Release Date:2018/08/22 16:29
  • Electromagnetic contactor

    Turning ON/OFF the output side during operation causes open/close surges that may trigger the protective function (against overcurrent or overvoltage) of the... More Details >>

    • No:21725
    • Release Date:2018/08/22 16:29
  • CC-Link

    Yes. More Details >>

    • No:21713
    • Release Date:2018/08/22 16:29
  • A7AY

    1. Yes.  2. The standard set by Pr.56. More Details >>

    • No:21669
    • Release Date:2018/08/22 16:28
  • CC-Link

    You can use optional items, such as enclosure surface operation panel FR-PA07 and parameter unit FR-PU07.Use the PU connector of the inverter for connection.... More Details >>

    • No:21832
    • Release Date:2018/08/22 16:29

231-240 of Total 393

Inquiries