Start main contents

Factory Automation

FAQ

Factory Automation

FAQAbout Products

  • Font Size
  • S
  • M
  • L

FAQ within [ FREQROL-E700 ]

231-240 of Total 393

prev 24 / 40page next
  • Operation panel LED

    No problem.LEDs "PU" and "EXT" indicate that Pr.79 is set to "3"."MON" indicates that the operation status is monitored."RUN" indicates that the inverter is ... More Details >>

    • No:21776
    • Release Date:2018/08/22 16:29
  • Parameter

    No parameter can be used to directly set this time.Changing Pr.9 (Electronic thermal O/L relay) changes the time. More Details >>

    • No:21769
    • Release Date:2018/08/22 16:29
  • CC-Link station number setting

    Change the setting in the PU operation mode.   More Details >>

    • No:21747
    • Release Date:2018/08/22 16:29
  • Operation panel (FR-PA02)

    Set Pr.146 (Built-in potentiometer switching) to "0".This allows for using the potentiometer built in the FR-PA02 to set the frequency.(Set this parameter to... More Details >>

    • No:21729
    • Release Date:2018/08/22 16:29
  • Electromagnetic contactor

    Turning ON/OFF the output side during operation causes open/close surges that may trigger the protective function (against overcurrent or overvoltage) of the... More Details >>

    • No:21725
    • Release Date:2018/08/22 16:29
  • Offline auto tuning

    Leave the setting of Pr.96 as "3". It indicates that auto tuning has been completed and the motor constant has been read. When it is changed unnecessarily, t... More Details >>

    • No:21352
    • Release Date:2018/08/22 16:27
  • Printing (character size) of FR-Configurator

    The size of the fonts are bigger to make it easy to read in Ver.2.01 of FR-Configurator (FR-SW3-SETUP-WJ). Download the latest version from the Mitsubishi El... More Details >>

    • No:21316
    • Release Date:2018/08/22 16:27
  • Output signal

    The length within 30 m is recommended. When the wiring length is long, signals may not be received accurately due to the increased inductance. More Details >>

    • No:20995
    • Release Date:2018/08/22 16:25
  • CC-Link

    You can start/stop operation, set the frequency, read/write parameters, and monitor the inverter via CC-Link communication. More Details >>

    • No:21901
    • Release Date:2018/08/22 16:29
  • CC-Link

    If you are using CC-Link just to monitor the inverter and using the analog signal and multi-speed setting to set the frequency, you need to input them extern... More Details >>

    • No:21900
    • Release Date:2018/08/22 16:29

231-240 of Total 393

Inquiries