Start main contents

Factory Automation

FAQ

Factory Automation

FAQAbout Products

  • Font Size
  • S
  • M
  • L

FAQ within [ FREQROL-E700 ]

231-240 of Total 393

prev 24 / 40page next
  • CC-Link

    If you are using CC-Link just to monitor the inverter and using the analog signal and multi-speed setting to set the frequency, you need to input them extern... More Details >>

    • No:21900
    • Release Date:2018/08/22 16:29
  • Transistor output module of the programmable controller

    Check if signals that are ON when the programmable controller's transistor output starts are always ON. More Details >>

    • No:21811
    • Release Date:2018/08/22 16:29
  • Frequency setting

    Yes, you can set them randomly.   More Details >>

    • No:21796
    • Release Date:2018/08/22 16:29
  • CC-Link

    Set Pr.340 (Communication startup mode selection) to other than "0".Also, set Pr.79 (Operation mode) to "0", "2", or "6".Powering the inverter on automatical... More Details >>

    • No:21903
    • Release Date:2018/08/22 16:30
  • Electromagnetic contactor

    It cannot be avoided by using parameters.   More Details >>

    • No:21724
    • Release Date:2018/08/22 16:29
  • FR-PA07

    No, we have no cable 50 cm long. The optional cables 1 m, 3 m, and 5 m long are available. (1 m: FR-CB201, 3 m: FR-CB203, 5 m: FR-CB205) More Details >>

    • No:21365
    • Release Date:2018/08/22 16:27
  • CC-Link option

    Yes, they are the same. More Details >>

    • No:21010
    • Release Date:2018/08/22 16:25
  • Output signal

    The length within 30 m is recommended. When the wiring length is long, signals may not be received accurately due to the increased inductance. More Details >>

    • No:20995
    • Release Date:2018/08/22 16:25
  • Programmable controller

    The error LED on the master side of the programmable controller blinks (faulty station present).According to the SW80 station information, an error flag is a... More Details >>

    • No:21813
    • Release Date:2018/08/22 16:29
  • NET mode

    After setting Pr.340 to "10", you need to power OFF then ON the inverter to make the new setting enabled because you are setting the operation upon power-on.... More Details >>

    • No:21759
    • Release Date:2018/08/22 16:29

231-240 of Total 393

Inquiries