Start main contents

Factory Automation

FAQ

Factory Automation

FAQAbout Products

  • Font Size
  • S
  • M
  • L

FAQ within [ FREQROL-E700 ]

231-240 of Total 393

prev 24 / 40page next
  • FR-PA07

    Since the FR-PA07 has the back cover and adapter, the FR-E5P is not necessary. More Details >>

    • No:21304
    • Release Date:2018/08/22 16:26
  • CC-Link

    You can set reserved and invalid stations.The Instruction Manual instructs to set consecutive numbers because the master regards an empty number as an error. More Details >>

    • No:21905
    • Release Date:2018/08/22 16:30
  • Frequency meter

    First, check if Pr.55 (Frequency monitor reference) that is the reference for the FM output is set correctly.Next, operate the inverter (without connecting a... More Details >>

    • No:21808
    • Release Date:2018/08/22 16:29
  • Frequency setting

    Even while the inverter is operating, you can use the setting dial to change the frequency and then press the SET key and the inverter operates at the new fr... More Details >>

    • No:21739
    • Release Date:2018/08/22 16:29
  • 10 VDC voltage from terminal 10

    Setting Pr.73 to "0" does not generate 10 VDC output.The inverter itself only has 5 V at the terminal 10.Setting this parameter to "0" allows 10 V input betw... More Details >>

    • No:21727
    • Release Date:2018/08/22 16:29
  • Support of Chinese

    Some types are designed for the Chinese market and provide Chinese manuals. (Note that the specifications of these types are partially different from the spe... More Details >>

    • No:21479
    • Release Date:2018/08/22 16:27
  • CC-Link option

    Yes, they are the same. More Details >>

    • No:21010
    • Release Date:2018/08/22 16:25
  • CC-Link

    No problem. The inverter actually occupies the reserved bits and does not use them. More Details >>

    • No:21890
    • Release Date:2018/08/22 16:29
  • CC-Link

    When configuring the inverter via communication such as CC-Link, some signals still requires to be input from the external terminals.(Terminal OH: External t... More Details >>

    • No:21888
    • Release Date:2018/08/22 16:29
  • CC-Link

    Use Pr.542 (Station number). More Details >>

    • No:21876
    • Release Date:2018/08/22 16:29

231-240 of Total 393

Inquiries