Start main contents

Factory Automation

FAQ

Factory Automation

FAQAbout Products

  • Font Size
  • S
  • M
  • L

FAQ within [ FREQROL-E700 ]

341-350 of Total 394

prev 35 / 40page next
  • NET operation mode

    Set Pr.340 (Communication startup mode selection) to "1" or "2".Also, by setting Pr.79 (Operation mode selection) to "0", "2", or "6", the inverter enters th... More Details >>

    • No:21879
    • Release Date:2018/08/22 16:29
  • Parameter setting

    Yes. The single-phase 200 V can be input. If the single-phase input is performed when Pr.872 (Input phase loss protection) is set to "1", the input phase los... More Details >>

    • No:21270
    • Release Date:2018/08/22 16:26
  • Frequency, monitor setting

    Set Pr.52 (PU/DU main display data selection) to "5".Set the monitor as the third monitor, frequency -> current -> setting frequency. More Details >>

    • No:21745
    • Release Date:2018/08/22 16:29
  • External operation

    The inverter has the calibration function.Use Pr.125 (Terminal 2 frequency setting gain frequency) and Pr.C4 (Terminal 2 frequency setting gain) for calibrat... More Details >>

    • No:21849
    • Release Date:2018/08/22 16:29
  • FR-PA07

    Since the FR-PA07 has the back cover and adapter, the FR-E5P is not necessary. More Details >>

    • No:21304
    • Release Date:2018/08/22 16:26
  • Terminal

    For an inverter with the terminal AU, use the terminal AU. For other inverters, assign the AU function to an unused terminal. And, short-circuit (turn ON) th... More Details >>

    • No:21678
    • Release Date:2018/08/22 16:28
  • Output voltage

    Since the output frequency was measured, it is considered that the start signal was input correctly.Check the output voltage on the voltage monitor of the in... More Details >>

    • No:21780
    • Release Date:2018/08/22 16:29
  • Frequency setting

    The frequency can be set to 65 Hz with the initial setting.Check if Pr.1 (Maximum frequency) is set to 60 Hz. More Details >>

    • No:21858
    • Release Date:2018/08/22 16:29
  • Network operation

    Yes. With the setting "66", you can choose NET operation when X66 is ON, and external operation when X66 is OFF. More Details >>

    • No:21675
    • Release Date:2018/08/22 16:28
  • External terminal

    1. Use the external terminals STF, RL, and SD. (A push-ON switch for operation is required between the terminals STF and SD, and a push-OFF switch is require... More Details >>

    • No:21816
    • Release Date:2018/08/22 16:29

341-350 of Total 394

Inquiries