Start main contents

Factory Automation

FAQ

Factory Automation

FAQAbout Products

  • Font Size
  • S
  • M
  • L

FAQ within [ FREQROL-E700 ]

381-390 of Total 394

prev 39 / 40page next
  • CC-Link, analog output card

    You can install only one option card.If you want to use two types of cards, replace the inverter with the FR-A700 series.If you can use RS485 communication i... More Details >>

    • No:21894
    • Release Date:2018/08/22 16:29
  • Circuit type of the FR-D700W/FR-E700W in the harmonics suppression guideline

    It is single-phase bridge (smoothing capacitor, double voltage rectification). More Details >>

    • No:20864
    • Release Date:2018/08/22 16:24
  • Terminal assignment

    The terminal MRS assignment parameter is Pr.183. Set Pr.183 to "4" (AU). (This setting is for the E700.) More Details >>

    • No:21850
    • Release Date:2018/08/22 16:29
  • FR-E720S-NC

    It is available on request as a dedicated product. Contact your sales representative. More Details >>

    • No:21183
    • Release Date:2018/08/22 16:26
  • CC-Link

    You can purchase the FR-A7NC E kit cover alone.Contact the distributor. More Details >>

    • No:21898
    • Release Date:2018/08/22 16:29
  • FR-E700

    The operation panel of the FR-E700 is not detachable because it is integrated.The operation panel of the FR-E500 can be used with the FR-E700 by using the co... More Details >>

    • No:21857
    • Release Date:2018/08/22 16:29
  • FR-E720S-KNC

    It is available on request. More Details >>

    • No:21164
    • Release Date:2018/08/22 16:26
  • English manual

    On the Mitsubishi Electric FA Global Website, choose "Inverter FREQROL", "Manual", and "FREQROL-E700", and change the language to "English". More Details >>

    • No:21666
    • Release Date:2018/08/22 16:28
  • Analog voltage

    Check the setting value of Pr.73. Or check Pr.C4 (Terminal 2 frequency setting gain) for the percentage of the voltage that is actually applied. For the FR-E... More Details >>

    • No:21356
    • Release Date:2018/08/22 16:27
  • CC-Link

    Set Pr.550 (NET mode operation command source selection) to "2" (PU connector is the command source).When operating the inverter using the USB connector, set... More Details >>

    • No:21904
    • Release Date:2018/08/22 16:30

381-390 of Total 394

Inquiries