Start main contents

Factory Automation

FAQ

Factory Automation

FAQAbout Products

  • Font Size
  • S
  • M
  • L

FAQ within [ FREQROL-E700 ]

41-50 of Total 393

prev 5 / 40page next
  • Output voltage

    Since the output frequency was measured, it is considered that the start signal was input correctly.Check the output voltage on the voltage monitor of the in... More Details >>

    • No:21780
    • Release Date:2018/08/22 16:29
  • Input phase loss

    The FR-E700, D700, F700PJ may activate input phase loss protection "E.ILF" if the phase-to-phase voltage of the power supply has become largely unbalanced. More Details >>

    • No:21339
    • Release Date:2018/08/22 16:27
  • Switching between External operation mode and PU operation mode

    Assign X16 signal, and set Pr.79 to "0", to switch the operation mode with turning ON/OFF X16 signal. More Details >>

    • No:21288
    • Release Date:2018/08/22 16:26
  • Frequency setting

    The frequency can be set to 65 Hz with the initial setting.Check if Pr.1 (Maximum frequency) is set to 60 Hz. More Details >>

    • No:21858
    • Release Date:2018/08/22 16:29
  • JOG function

    When Pr.79 is set to "3", the JOG operation is not available by turning ON the terminal JOG.Instead of the JOG function, you can set the low-speed RL of the ... More Details >>

    • No:21760
    • Release Date:2018/08/22 16:29
  • Frequency setting signal

    Check the AU signal (AU - SD). To use the terminal 4, the AU signal (AU - SD) needs to be turned ON. Turning ON the AU signal (AU - SD) disables the terminal 2. More Details >>

    • No:21267
    • Release Date:2018/08/22 16:26
  • Switching between external operation and NET operation

    You can write frequency setting by setting Pr.339 (Communication speed command source) to "0". More Details >>

    • No:21687
    • Release Date:2018/08/22 16:28
  • External terminal

    1. Use the external terminals STF, RL, and SD. (A push-ON switch for operation is required between the terminals STF and SD, and a push-OFF switch is require... More Details >>

    • No:21816
    • Release Date:2018/08/22 16:29
  • FR-DU07

    Not possible.Instead of FR-DU07, use FR-PA07 (or FR-PU07) as an operation panel for FR-E700. More Details >>

    • No:21708
    • Release Date:2018/08/22 16:29
  • Megger test

    When carrying out the megger test of the inverter, shorten all the terminals R, S, T, U, V, and W of the main circuit and use the 500 VDC megger for earth. D... More Details >>

    • No:21327
    • Release Date:2018/08/22 16:27

41-50 of Total 393

Inquiries