Start main contents

Factory Automation

FAQ

Factory Automation

FAQAbout Products

  • Font Size
  • S
  • M
  • L

FAQ within [ FREQROL-E700 ]

81-90 of Total 394

prev 9 / 40page next
  • Programmable controller

    Please use the inverter optional FR-A7AY.It supports voltage output (0 to 10 VDC) and current output (0 to 20 mA DC).For the voltage output (0 to 10 VDC), th... More Details >>

    • No:21812
    • Release Date:2018/08/22 16:29
  • CC-Link

    You can use optional items, such as enclosure surface operation panel FR-PA07 and parameter unit FR-PU07.Use the PU connector of the inverter for connection.... More Details >>

    • No:21832
    • Release Date:2018/08/22 16:29
  • CC-Link

    Slow blinking of the RUN LED indicates reverse operation.Fast blinking indicates that while the start command is input, the running frequency command is not ... More Details >>

    • No:21833
    • Release Date:2018/08/22 16:29
  • CC-Link

    If you are using CC-Link just to monitor the inverter and using the analog signal and multi-speed setting to set the frequency, you need to input them extern... More Details >>

    • No:21900
    • Release Date:2018/08/22 16:29
  • CC-Link

    Set Pr.340 (Communication startup mode selection) to other than "0".Also, set Pr.79 (Operation mode) to "0", "2", or "6".Powering the inverter on automatical... More Details >>

    • No:21903
    • Release Date:2018/08/22 16:30
  • CC-Link

    You can set reserved and invalid stations.The Instruction Manual instructs to set consecutive numbers because the master regards an empty number as an error. More Details >>

    • No:21905
    • Release Date:2018/08/22 16:30
  • Replacement

    The station number and baud rate were set using the dial for the FR-A5NC, but parameter is used for the FR-A7NC. Pr.542 (Communication station number (CC-Lin... More Details >>

    • No:21248
    • Release Date:2018/08/22 16:26
  • CC-Link

    Yes. More Details >>

    • No:21713
    • Release Date:2018/08/22 16:29
  • CC-Link

    Check if the master station uses CC-Link Version 1 and the FR-A7NC uses CC-Link Version 2. More Details >>

    • No:21831
    • Release Date:2018/08/22 16:29
  • CC-Link

    If Pr.340 (Communication startup mode selection) and Pr.79 (Operation mode selection) are set so that the inverter starts CC-Link operation from power-on and... More Details >>

    • No:21840
    • Release Date:2018/08/22 16:29

81-90 of Total 394

Inquiries