Start main contents

Factory Automation

FAQ

Factory Automation

FAQAbout Products

  • Font Size
  • S
  • M
  • L

FAQ within [ FREQROL-A700 ]

151-160 of Total 351

prev 16 / 36page next
  • CC-Link communication

    After setting Pr.79 (Operation mode selection) to "2" and Pr.340 (Communication startup mode selection) to "10", reset the inverter (or power ON again) to st... More Details >>

    • No:21256
    • Release Date:2018/08/22 16:26
  • AM terminal output

    Set Pr.55 (Frequency monitoring reference) of the first inverter to 70 Hz. More Details >>

    • No:21257
    • Release Date:2018/08/22 16:26
  • Parameter copy of FR-Configurator

    The parameter can be copied to only one inverter. More Details >>

    • No:21306
    • Release Date:2018/08/22 16:26
  • Transistor output module of the programmable controller

    Check if signals that are ON when the programmable controller's transistor output starts are always ON. More Details >>

    • No:21811
    • Release Date:2018/08/22 16:29
  • Running frequency

    The power supply voltage may have dropped.Read the converter output voltage monitor (Pr.55 = 8) and check if Converter output voltage monitor/√2 is within th... More Details >>

    • No:21820
    • Release Date:2018/08/22 16:29
  • Running frequency

    Check the setting of Pr.1 (Maximum frequency) and Pr.18 (High speed maximum frequency).Pr.1 is initially set to "120 Hz". More Details >>

    • No:21821
    • Release Date:2018/08/22 16:29
  • Parameter setting

    Set Pr.9, Pr.71, Pr.80, Pr.81, Pr.83, Pr.84, and Pr.96.   More Details >>

    • No:21721
    • Release Date:2018/08/22 16:29
  • Frequency setting

    No. You cannot change the setting during operation.However, setting Pr.77 (Parameter write selection) to "2" allows for the setting change during operation. ... More Details >>

    • No:21734
    • Release Date:2018/08/22 16:29
  • Terminal FM meter connection

    Check the connection with the meter.If the terminal FM is connected to the positive terminal and the terminal SD is connected to the negative terminal of the... More Details >>

    • No:21762
    • Release Date:2018/08/22 16:29
  • CC-Link

    1. You can reset the inverter from an external terminal.You can do it without regard to the setting of Pr.338 (Communication operation command source) and Pr... More Details >>

    • No:21837
    • Release Date:2018/08/22 16:29

151-160 of Total 351

Inquiries