FAQ


FAQAbout Products

- FAQ > Drive Products > Inverters-FREQROL > FREQROL-A700
FAQ
Keyword Search
FAQ within [ FREQROL-A700 ]
-
Increasing the value of Pr.0 (Torque boost) increases the output voltage, and the output current also increases.Note that increasing this value too high puts... More Details >>
- No:21732
- Release Date:2018/08/22 16:29
-
Switching between external operation and NET operation
You can switch between external operation and NET operation by turning ON/OFF the terminal X66 (RM). You can switch while Pr.79 (Operation mode) is set to "6... More Details >>
- No:21688
- Release Date:2018/08/22 16:28
-
Switching between external operation and NET operation
You can monitor the fault output in both NET operation and external operation. More Details >>
- No:21686
- Release Date:2018/08/22 16:28
-
For an inverter with the terminal AU, use the terminal AU. For other inverters, assign the AU function to an unused terminal. And, short-circuit (turn ON) th... More Details >>
- No:21678
- Release Date:2018/08/22 16:28
-
Press the "MODE" key on the operation panel several times to display "P.0" and parameter setting screen. Then turn the setting dial to display "C..." screen ... More Details >>
- No:21336
- Release Date:2018/08/22 16:27
-
When carrying out the megger test of the inverter, shorten all the terminals R, S, T, U, V, and W of the main circuit and use the 500 VDC megger for earth. D... More Details >>
- No:21327
- Release Date:2018/08/22 16:27
-
No, it cannot be normally closed contact. When the electronic bypass function is used, the setting of Pr.17 is disabled. More Details >>
- No:21193
- Release Date:2018/08/22 16:26
-
No, it is not available. It is only available in the External operation mode or combined operation mode (PU speed command and External operation command (Pr.... More Details >>
- No:21192
- Release Date:2018/08/22 16:26
-
The following reasons are possible. - The signal of Z phase does not exist. (It is not returned normally.) - The setting of Pr.359 encoder rotation direction... More Details >>
- No:21162
- Release Date:2018/08/22 16:26
-
The total wiring length is as follows: 100 m + (20 m × 5) = 200m. More Details >>
- No:21144
- Release Date:2018/08/22 16:26
41-50 of Total 352