Start main contents

Factory Automation

FAQ

Factory Automation

FAQAbout Products

  • Font Size
  • S
  • M
  • L

FAQ within [ FREQROL-A700 ]

41-50 of Total 352

prev 5 / 36page next
  • Network operation

    Set Pr.338 to "0" (NET) and Pr.339 to "1" or "2". More Details >>

    • No:21674
    • Release Date:2018/08/22 16:28
  • Parameter display setting

    Normally, Pr.80 and Pr.81 are the parameters that can be changed when the operation is stopped in the PU operation mode. The "Er4" is a mode designation erro... More Details >>

    • No:21335
    • Release Date:2018/08/22 16:27
  • Frequency setting

    You can use it for inverter operation, but the running speed of the inverter does not change linearly with regard to turn of the frequency setting potentiome... More Details >>

    • No:21912
    • Release Date:2018/08/22 16:30
  • Frequency setting

    Adjust the terminal 2 bias with Pr.C2 and Pr.C3, and the terminal 2 gain with Pr.125 and Pr.C4. Set Pr.C2 (Terminal 2 frequency setting bias frequency) to 20... More Details >>

    • No:21685
    • Release Date:2018/08/22 16:28
  • Connecting ammeter to output side

    Yes. Use a moving-iron type ammeter. However, if the carrier frequency exceeds 5 kHz, do not use that meter since an overcurrent losses produced in the inter... More Details >>

    • No:21681
    • Release Date:2018/08/22 16:28
  • Operation panel

    This is because the protective function works to stop the motor. It is not a fault indication.To cancel the protective function, turn OFF the start signal an... More Details >>

    • No:21775
    • Release Date:2018/08/22 16:29
  • Network operation

    Yes. With the setting "66", you can choose NET operation when X66 is ON, and external operation when X66 is OFF. More Details >>

    • No:21675
    • Release Date:2018/08/22 16:28
  • Frequency meter and calibration resistor

    Frequency meter: YM206NRI 1 mA Calibration resistor: RV24YN 10 k?. More Details >>

    • No:21357
    • Release Date:2018/08/22 16:27
  • Megger test

    When carrying out the megger test of the inverter, shorten all the terminals R, S, T, U, V, and W of the main circuit and use the 500 VDC megger for earth. D... More Details >>

    • No:21327
    • Release Date:2018/08/22 16:27
  • Operation panel (DU04)

    The FR-DU04 can be used in the 700 series inverters, however, some restrictions apply and parameter copy is disabled. More Details >>

    • No:21261
    • Release Date:2018/08/22 16:26

41-50 of Total 352

Inquiries