Start main contents

Factory Automation

FAQ

Factory Automation

FAQAbout Products

  • Font Size
  • S
  • M
  • L

FAQ within [ FREQROL-A700 ]

81-90 of Total 351

prev 9 / 36page next
  • CC-Link

    You can select from the output power (in 0.01 kW units) and cumulative energy (in 1 kWh/0.01 kWh units). More Details >>

    • No:21885
    • Release Date:2018/08/22 16:29
  • CC-Link

    You can start/stop operation, set the frequency, read/write parameters, and monitor the inverter via CC-Link communication. More Details >>

    • No:21901
    • Release Date:2018/08/22 16:29
  • Coasting

    1. Set Pr.162 to "10" (Frequency search at every start).2. You can ignore the setting if the motor excitation current is unknown. More Details >>

    • No:21718
    • Release Date:2018/08/22 16:29
  • CC-Link

    Yes. Set the first monitor code in the lower 8 bits and the second monitor code in the upper 8 bits of RWwn.Set H6F to the first monitor code, and H70 to the... More Details >>

    • No:21824
    • Release Date:2018/08/22 16:29
  • CC-Link

    The start commands cannot be input from both sources simultaneously because the operation command source is specified.You can switch the command source as ne... More Details >>

    • No:21828
    • Release Date:2018/08/22 16:29
  • CC-Link

    "n" in the address RWwn indicates a value determined by the station number setting. More Details >>

    • No:21867
    • Release Date:2018/08/22 16:29
  • Advanced magnetic flux vector control

    When using the geared motor GM-S(B), set Pr.71 to "13" and also set Pr.9, Pr.80, and Pr.81.Perform auto tuning as required. Perform auto tuning as required. ... More Details >>

    • No:21756
    • Release Date:2018/08/22 16:29
  • CC-Link

    Use Pr.542 to set the station number and Pr.543 to set the baud rate.To set the baud rate to 10 Mbps, set Pr.543 to "4". More Details >>

    • No:21839
    • Release Date:2018/08/22 16:29
  • CC-Link

    If Pr.340 (Communication startup mode selection) and Pr.79 (Operation mode selection) are set so that the inverter starts CC-Link operation from power-on and... More Details >>

    • No:21840
    • Release Date:2018/08/22 16:29
  • CC-Link

    Connect the wire to the optional FR-A7NC's terminal block. (The terminal block is detachable.) More Details >>

    • No:21875
    • Release Date:2018/08/22 16:29

81-90 of Total 351

Inquiries