Start main contents

Factory Automation

FAQ

Factory Automation

FAQAbout Products

  • Font Size
  • S
  • M
  • L

FAQ within [ FREQROL-F700 ]

201-210 of Total 296

prev 21 / 30page next
  • Control terminal

    Yes. (Terminal SDs are connected with each other inside of the inverter.) More Details >>

    • No:21845
    • Release Date:2018/08/22 16:29
  • Number of stations that can be set in FR Configurator

    The station numbers that can be set differ depending on the version of FR-Configurator (FR-SW3-SETUP-WJ) setup software. For Ver.2.00 or later, station numbe... More Details >>

    • No:21305
    • Release Date:2018/08/22 16:26
  • Frequency setting

    Set Pr.79 (Operation mode) to "3".When a signal is input to the terminal RL, the inverter starts operating at the frequency set with Pr.6 (Multi-speed settin... More Details >>

    • No:21791
    • Release Date:2018/08/22 16:29
  • Frequency setting

    You can do so by assigning the terminal AU.Assign the terminal AU to an unused terminal.(For example, when assigning AU to the terminal RL, set Pr.180 = 4.)B... More Details >>

    • No:21915
    • Release Date:2018/08/22 16:30
  • Operation method

    Set Pr.79 (Operation mode) to "3" and Pr.161 (Frequency setting/key lock operation selection) to "1". More Details >>

    • No:21249
    • Release Date:2018/08/22 16:26
  • PU operation

    If Pr.79 = 3, PU and EXT turn ON. Switching between PU and EXT is not available. Turn the setting dial to set the frequency and press the SET key to accept it. More Details >>

    • No:21695
    • Release Date:2018/08/22 16:28
  • CC-Link

    Create a ladder program to read inverter faults on the programmable controller.Set the instruction code (H74-H77) and turn ON the instruction code execution ... More Details >>

    • No:21886
    • Release Date:2018/08/22 16:29
  • Pulse change

    When the pulse is counted and displayed, 1440 pulses are output with the frequency of the inverter is 60 Hz. Since these pulses are limited to 2400 pulses, a... More Details >>

    • No:21334
    • Release Date:2018/08/22 16:27
  • CC-Link

    Set Pr.79 (Operation mode) setting value to "0", "2", or "6", Pr.340 (Communication startup mode selection) other than the setting value, Pr.542 (Station num... More Details >>

    • No:21896
    • Release Date:2018/08/22 16:29
  • Switching between PU and NET operation modes

    Set Pr.340 (Communication startup mode selection) to "10".The operation mode can be switched between PU and NET by assigning X65 (PU-NET operation switching)... More Details >>

    • No:21878
    • Release Date:2018/08/22 16:29

201-210 of Total 296

Inquiries