Start main contents

Factory Automation

FAQ

Factory Automation

FAQAbout Products

  • Font Size
  • S
  • M
  • L

FAQ within [ FREQROL-F700 ]

261-270 of Total 296

prev 27 / 30page next
  • FR-A7AR E kit (Relay output function)

    Yes, you can set all of the three relay contacts to fault contacts.Set Pr.320 (RA1 output selection), 321 (RA2 output selection), and 322 (RA3 output selecti... More Details >>

    • No:21712
    • Release Date:2018/08/22 16:29
  • CC-Link

    Yes. Set the first monitor code in the lower 8 bits and the second monitor code in the upper 8 bits of RWwn.Set H6F to the first monitor code, and H70 to the... More Details >>

    • No:21824
    • Release Date:2018/08/22 16:29
  • External multi-speed setting and multi-speed command

    It depends on the setting of Pr.79 (Operation mode).Pr.79 can be set to "2" or "3".If Pr.79 is "2", it is judged that the multi-speed frequency command was s... More Details >>

    • No:21815
    • Release Date:2018/08/22 16:29
  • Programmable controller

    The error LED on the master side of the programmable controller blinks (faulty station present).According to the SW80 station information, an error flag is a... More Details >>

    • No:21813
    • Release Date:2018/08/22 16:29
  • Output current value

    The detection level of the output current value cannot be changed using a potentiometer or a similar device.   More Details >>

    • No:21779
    • Release Date:2018/08/22 16:29
  • Electronic bypass function

    Turn ON and OFF the RES signal to enable the inverter-driven operation. More Details >>

    • No:21190
    • Release Date:2018/08/22 16:26
  • CC-Link

    Create a ladder program to read inverter faults on the programmable controller.Set the instruction code (H74-H77) and turn ON the instruction code execution ... More Details >>

    • No:21886
    • Release Date:2018/08/22 16:29
  • CC-Link

    The way to monitor the output current and read parameters via CC-Link is identical in all operation modes.  More Details >>

    • No:21872
    • Release Date:2018/08/22 16:29
  • CC-Link

    To set the frequency via CC-Link communication, the NET mode should be selected. The new parameter setting is applied after powering OFF and then ON the inve... More Details >>

    • No:21763
    • Release Date:2018/08/22 16:29
  • CC-Link

    The FR-A7NC is required. ("FR-A7NC-E kit" for the FR-E700 series. The FR-E700-NC CC-Link communication type does not require an option.) More Details >>

    • No:21668
    • Release Date:2018/08/22 16:28

261-270 of Total 296

Inquiries