FAQ


FAQAbout Products
- FAQ > Drive Products > Inverters-FREQROL > FREQROL-F700
FAQ
Keyword Search
FAQ within [ FREQROL-F700 ]
-
Pr.30 = "1" and Pr.70 = "0". More Details >>
- No:21143
- Release Date:2018/08/22 16:26
-
Check the AU signal (AU - SD). To use the terminal 4, the AU signal (AU - SD) needs to be turned ON. Turning ON the AU signal (AU - SD) disables the terminal 2. More Details >>
- No:21267
- Release Date:2018/08/22 16:26
-
Check if the input side voltage is equally applied to all three phases. The S phase voltage may be low because the input current flows when the voltage of th... More Details >>
- No:21340
- Release Date:2018/08/22 16:27
-
1. For MRS, coasting starts when the MRS contact turns ON. For Pr.250 = "0",IM is coasting immediately when the start signal is turned OFF. 2. No. Set eithe... More Details >>
- No:21360
- Release Date:2018/08/22 16:27
-
Reverse rotation prevention selection
Yes, it does. When the inverter is coasting in the reverse direction, it starts in the reverse direction and switches to the forward rotation after a deceler... More Details >>
- No:21125
- Release Date:2018/08/22 16:26
-
Proportional band of multiple inverters
By importing the operation frequency from the AM terminal (analog output) of the first inverter to the FR-FH (ratio setter), the operation command which is p... More Details >>
- No:21250
- Release Date:2018/08/22 16:26
-
Switching between PU and NET operation modes
Set Pr.340 (Communication startup mode selection) to "10".The operation mode can be switched between PU and NET by assigning X65 (PU-NET operation switching)... More Details >>
- No:21878
- Release Date:2018/08/22 16:29
-
Purchase the FR-A7NC if you are using the option with the FR-A700 or FR-F700P (F700).Purchase the FR-A7NC E kit if you are using the option with the FR-E700. More Details >>
- No:21902
- Release Date:2018/08/22 16:30
-
If Pr.79 = 3, PU and EXT turn ON. Switching between PU and EXT is not available. Turn the setting dial to set the frequency and press the SET key to accept it. More Details >>
- No:21695
- Release Date:2018/08/22 16:28
-
You can start/stop operation, set the frequency, read/write parameters, and monitor the inverter via CC-Link communication. More Details >>
- No:21901
- Release Date:2018/08/22 16:29
271-280 of Total 296