Start main contents

Factory Automation

FAQ

Factory Automation

FAQAbout Products

  • Font Size
  • S
  • M
  • L

FAQ within [ FREQROL-F700 ]

281-290 of Total 295

prev 29 / 30page next
  • Programmable controller

    The error LED on the master side of the programmable controller blinks (faulty station present).According to the SW80 station information, an error flag is a... More Details >>

    • No:21813
    • Release Date:2018/08/22 16:29
  • CC-Link station number setting

    Change the setting in the PU operation mode.   More Details >>

    • No:21747
    • Release Date:2018/08/22 16:29
  • Output current

    Increasing the value of Pr.0 (Torque boost) increases the output voltage, and the output current also increases.Note that increasing this value too high puts... More Details >>

    • No:21732
    • Release Date:2018/08/22 16:29
  • CC-Link

    The FR-A7NC is required. ("FR-A7NC-E kit" for the FR-E700 series. The FR-E700-NC CC-Link communication type does not require an option.) More Details >>

    • No:21668
    • Release Date:2018/08/22 16:28
  • CC-Link

    Yes. The FR-A7NC E kit contains a dedicated front cover since its size changes by the installed board.You can additionally purchase the FR-A7NC E kit cover o... More Details >>

    • No:21889
    • Release Date:2018/08/22 16:29
  • FR-Configurator

    1. You can set the station number.However, you can only connect a single personal computer to a single inverter.2. You can set communication by choosing Tool... More Details >>

    • No:21882
    • Release Date:2018/08/22 16:29
  • CC-Link

    You cannot monitor the running frequency and conveyor speed (machine speed) simultaneously.The inverter does not have a function to output them simultaneously. More Details >>

    • No:21827
    • Release Date:2018/08/22 16:29
  • 400 V inverter

    No, it does not run. "Err" is displayed when it is operated. Always input the same voltage (400 V) to the main power supply and control power supply. More Details >>

    • No:21179
    • Release Date:2018/08/22 16:26
  • CC-Link

    When configuring the inverter via communication such as CC-Link, some signals still requires to be input from the external terminals.(Terminal OH: External t... More Details >>

    • No:21888
    • Release Date:2018/08/22 16:29
  • CC-Link

    You can select from the output power (in 0.01 kW units) and cumulative energy (in 1 kWh/0.01 kWh units). More Details >>

    • No:21885
    • Release Date:2018/08/22 16:29

281-290 of Total 295

Inquiries