Start main contents

Factory Automation

FAQ

Factory Automation

FAQAbout Products

  • Font Size
  • S
  • M
  • L

FAQ within [ FREQROL-F700P ]

121-130 of Total 295

prev 13 / 30page next
  • Frequency setting signal

    Check the AU signal (AU - SD). To use the terminal 4, the AU signal (AU - SD) needs to be turned ON. Turning ON the AU signal (AU - SD) disables the terminal 2. More Details >>

    • No:21267
    • Release Date:2018/08/22 16:26
  • Frequency setting

    You can use the setting dial together with the terminal 4.Set Pr.79 (Operation mode) to "3" (Combined operation mode) and assign the AU signal to an unused t... More Details >>

    • No:21856
    • Release Date:2018/08/22 16:29
  • Frequency setting

    Yes.The inverter requires the start signal and frequency setting signal. More Details >>

    • No:21793
    • Release Date:2018/08/22 16:29
  • Frequency setting

    Set Pr.3 (Base frequency) and Pr.18 (High speed maximum frequency) to "340 Hz", Pr.19 (Base frequency voltage) to "200 V", Pr.125 (Terminal 2 frequency setti... More Details >>

    • No:21789
    • Release Date:2018/08/22 16:29
  • Speed setting

    Use the inverter's calibration parameters Pr.C2/C3, Pr.125/C4 to adjust the bias and gain for each inverter.Connect the wires from the frequency setting pote... More Details >>

    • No:21728
    • Release Date:2018/08/22 16:29
  • Frequency setting

    For the set frequency 60 Hz, ±6 Hz is applied and thus the up to frequency signal is output between 54 Hz and 66 Hz. During acceleration/deceleration to the ... More Details >>

    • No:21348
    • Release Date:2018/08/22 16:27
  • Speed command

    Calibrate the terminal 2 bias. More Details >>

    • No:21281
    • Release Date:2018/08/22 16:26
  • Setting frequency

    Set Pr.52 (DU/PU main display data selection) to "100".Displaying the setting frequency while the inverter is stopped and the output frequency while it is op... More Details >>

    • No:21783
    • Release Date:2018/08/22 16:29
  • Multi-speed setting

    Priorities are: Low speed (RL) > Middle speed (RM) > High speed (RH).For example, if the low speed (RL) and middle speed (RM) signals are input simulta... More Details >>

    • No:21772
    • Release Date:2018/08/22 16:29
  • Switching between external operation and NET operation

    You can monitor the fault output in both NET operation and external operation. More Details >>

    • No:21686
    • Release Date:2018/08/22 16:28

121-130 of Total 295

Inquiries