Start main contents

Factory Automation

FAQ

Factory Automation

FAQAbout Products

  • Font Size
  • S
  • M
  • L

FAQ within [ FREQROL-F700P ]

131-140 of Total 294

prev 14 / 30page next
  • Network operation

    Set Pr.338 to "0" (NET) and Pr.339 to "1" or "2". More Details >>

    • No:21674
    • Release Date:2018/08/22 16:28
  • CC-Link

    Yes. However, write the setting data to the RAM of the inverter.Set RWw1 in the setting value and turn ON the frequency setting command RYD.To continuously s... More Details >>

    • No:21825
    • Release Date:2018/08/22 16:29
  • Frequency setting

    To accept the current signal, the terminals AU (current input selection) and SD must be short-circuited. Check it.Note that this terminal AU is not prepared ... More Details >>

    • No:21799
    • Release Date:2018/08/22 16:29
  • Monitor indicator

    Press the "SET" key once while the output frequency is monitored.The unit indicator LED changes from "Hz" to "A" and the monitor display changes to the current. More Details >>

    • No:21764
    • Release Date:2018/08/22 16:29
  • Speed setting

    Use the inverter's calibration parameters Pr.C2/C3, Pr.125/C4 to adjust the bias and gain for each inverter.Connect the wires from the frequency setting pote... More Details >>

    • No:21728
    • Release Date:2018/08/22 16:29
  • Switching between external operation and NET operation

    You can monitor the fault output in both NET operation and external operation. More Details >>

    • No:21686
    • Release Date:2018/08/22 16:28
  • Terminal

    Signals input from the terminal 4 are not enabled if the terminal AU is not ON. For an inverter without the terminal AU, assign the AU function to an unused ... More Details >>

    • No:21679
    • Release Date:2018/08/22 16:28
  • PU operation

    1. Yes. 2. Set Pr.17 to "2".  3. If the start signal is ON, the operation continues even the emergency stop is OFF. More Details >>

    • No:21359
    • Release Date:2018/08/22 16:27
  • Connection cable of FR-Configurator

    It is the standardized Mini-B connector. More Details >>

    • No:21312
    • Release Date:2018/08/22 16:26
  • Replacement

    It is Pr.125 (Terminal 2 frequency setting gain frequency). Adjust the slope with C4 (903) (Terminal 2 frequency setting gain) as necessary. More Details >>

    • No:21247
    • Release Date:2018/08/22 16:26

131-140 of Total 294

Inquiries