Start main contents

Factory Automation

FAQ

Factory Automation

FAQAbout Products

  • Font Size
  • S
  • M
  • L

FAQ within [ FREQROL-F700P ]

131-140 of Total 295

prev 14 / 30page next
  • FR-Configurator

    Yes, you can use the setup software (FR-SW3-SETUP-WJ) to set it.   More Details >>

    • No:21711
    • Release Date:2018/08/22 16:29
  • Brake unit

    The resistors cannot be used in combination other than described. Operations of brake units and inverters are not verified. When resistors are used in uncert... More Details >>

    • No:21328
    • Release Date:2018/08/22 16:27
  • Megger test

    When carrying out the megger test of the inverter, shorten all the terminals R, S, T, U, V, and W of the main circuit and use the 500 VDC megger for earth. D... More Details >>

    • No:21327
    • Release Date:2018/08/22 16:27
  • Graph function in FR-Configurator

    Even the USB is used, FR Configurator requires at least 50 ms sampling time (for each monitoring item). In this case, since three types of data are monitored... More Details >>

    • No:21310
    • Release Date:2018/08/22 16:26
  • Control terminal

    You also need to set Pr.79 (Operation mode) to "3". More Details >>

    • No:21844
    • Release Date:2018/08/22 16:29
  • Frequency setting

    In this case, the JOG operation is prioritized.When the terminals JOG and SD are short-circuited and turned ON, the frequency setting by the external potenti... More Details >>

    • No:21804
    • Release Date:2018/08/22 16:29
  • Frequency setting

    Set Pr.125 (Terminal 2 frequency setting gain frequency) instead of Pr.1 (Maximum frequency).   More Details >>

    • No:21802
    • Release Date:2018/08/22 16:29
  • Frequency setting

    Check the setting of Pr.79 (Operation mode).If the setting value is "2", frequency commands from an external terminal is effective and the frequency setting ... More Details >>

    • No:21797
    • Release Date:2018/08/22 16:29
  • Output voltage

    Since the output frequency was measured, it is considered that the start signal was input correctly.Check the output voltage on the voltage monitor of the in... More Details >>

    • No:21780
    • Release Date:2018/08/22 16:29
  • Monitor indicator

    The first priority window of the monitor may be set to the current.When the current is displayed on the monitor (the unit is "A"), press "SET" to switch to t... More Details >>

    • No:21765
    • Release Date:2018/08/22 16:29

131-140 of Total 295

Inquiries