Start main contents

Factory Automation

FAQ

Factory Automation

FAQAbout Products

  • Font Size
  • S
  • M
  • L

FAQ within [ FREQROL-F700P ]

241-250 of Total 294

prev 25 / 30page next
  • Coasting

    1. Set Pr.162 to "10" (Frequency search at every start).2. You can ignore the setting if the motor excitation current is unknown. More Details >>

    • No:21718
    • Release Date:2018/08/22 16:29
  • Electronic bypass function

    The operation cannot be manually switched to the commercial power supply operation at an inverter fault. The operation can be automatically switched to the c... More Details >>

    • No:21191
    • Release Date:2018/08/22 16:26
  • FR-A7AR E kit (Relay output function)

    Yes, you can set all of the three relay contacts to fault contacts.Set Pr.320 (RA1 output selection), 321 (RA2 output selection), and 322 (RA3 output selecti... More Details >>

    • No:21712
    • Release Date:2018/08/22 16:29
  • CC-Link

    Create a ladder program to read inverter faults on the programmable controller.Set the instruction code (H74-H77) and turn ON the instruction code execution ... More Details >>

    • No:21886
    • Release Date:2018/08/22 16:29
  • CC-Link

    You can select from the output power (in 0.01 kW units) and cumulative energy (in 1 kWh/0.01 kWh units). More Details >>

    • No:21885
    • Release Date:2018/08/22 16:29
  • CC-Link

    Yes. More Details >>

    • No:21871
    • Release Date:2018/08/22 16:29
  • CC-Link station number setting

    Change the setting in the PU operation mode.   More Details >>

    • No:21747
    • Release Date:2018/08/22 16:29
  • Installation of options

    Use the digital output/additional analog output FR-A7AY (E kit). More Details >>

    • No:21290
    • Release Date:2018/08/22 16:26
  • Electronic bypass function

    With the automatic bypass sequence (Pr.139 ≠ 9999, Pr.159 = 9999), the motor operation is switched to commercial power supply operation when the output frequ... More Details >>

    • No:21189
    • Release Date:2018/08/22 16:26
  • CC-Link

    The start commands cannot be input from both sources simultaneously because the operation command source is specified.You can switch the command source as ne... More Details >>

    • No:21828
    • Release Date:2018/08/22 16:29

241-250 of Total 294

Inquiries