FAQ


FAQAbout Products
- FAQ > Drive Products > Inverters-FREQROL > FREQROL-F700P
FAQ
Keyword Search
FAQ within [ FREQROL-F700P ]
-
Yes. The FR-A7NC E kit contains a dedicated front cover since its size changes by the installed board.You can additionally purchase the FR-A7NC E kit cover o... More Details >>
- No:21889
- Release Date:2018/08/22 16:29
-
Printing (character size) of FR-Configurator
The size of the fonts are bigger to make it easy to read in Ver.2.01 of FR-Configurator (FR-SW3-SETUP-WJ). Download the latest version from the Mitsubishi El... More Details >>
- No:21316
- Release Date:2018/08/22 16:27
-
The error LED on the master side of the programmable controller blinks (faulty station present).According to the SW80 station information, an error flag is a... More Details >>
- No:21813
- Release Date:2018/08/22 16:29
-
Transistor output module of the programmable controller
Check if signals that are ON when the programmable controller's transistor output starts are always ON. More Details >>
- No:21811
- Release Date:2018/08/22 16:29
-
1. Yes. 2. The standard set by Pr.56. More Details >>
- No:21669
- Release Date:2018/08/22 16:28
-
"n" in the address RWwn indicates a value determined by the station number setting. More Details >>
- No:21867
- Release Date:2018/08/22 16:29
-
Check if the master station uses CC-Link Version 1 and the FR-A7NC uses CC-Link Version 2. More Details >>
- No:21831
- Release Date:2018/08/22 16:29
-
When Pr.79 is set to "3", since the start command is in the External operation mode, the RUN key of FR-PA07 does not work. More Details >>
- No:21303
- Release Date:2018/08/22 16:26
-
You can select from the output power (in 0.01 kW units) and cumulative energy (in 1 kWh/0.01 kWh units). More Details >>
- No:21885
- Release Date:2018/08/22 16:29
-
Up to 42 units can be connected. (When only inverters are connected) More Details >>
- No:21873
- Release Date:2018/08/22 16:29
241-250 of Total 294