Start main contents

Factory Automation

FAQ

Factory Automation

FAQAbout Products

  • Font Size
  • S
  • M
  • L

FAQ within [ FREQROL-F700P ]

251-260 of Total 294

prev 26 / 30page next
  • Switching between external operation and NET operation

    You can write frequency setting by setting Pr.339 (Communication speed command source) to "0". More Details >>

    • No:21687
    • Release Date:2018/08/22 16:28
  • Operation panel

    If "PS" is displayed even the "STOP/RESET" key on the operation panel is not pressed, a inverter fault may be the cause. In this case, consult with your sale... More Details >>

    • No:21343
    • Release Date:2018/08/22 16:27
  • Frequency setting

    Adjust the terminal 2 bias with Pr.C2 and Pr.C3, and the terminal 2 gain with Pr.125 and Pr.C4. Set Pr.C2 (Terminal 2 frequency setting bias frequency) to 20... More Details >>

    • No:21685
    • Release Date:2018/08/22 16:28
  • Frequency setting

    Set Pr.3 (Base frequency) and Pr.18 (High speed maximum frequency) to "340 Hz", Pr.19 (Base frequency voltage) to "200 V", Pr.125 (Terminal 2 frequency setti... More Details >>

    • No:21789
    • Release Date:2018/08/22 16:29
  • Instruction manual

    For the Instruction Manual "Applied", fill in the request sheet which is included in the last part of the Instruction Manual "Basic", and fax it to the speci... More Details >>

    • No:21341
    • Release Date:2018/08/22 16:27
  • Output voltage

    Since the output frequency was measured, it is considered that the start signal was input correctly.Check the output voltage on the voltage monitor of the in... More Details >>

    • No:21780
    • Release Date:2018/08/22 16:29
  • JOG function

    When Pr.79 is set to "3", the JOG operation is not available by turning ON the terminal JOG.Instead of the JOG function, you can set the low-speed RL of the ... More Details >>

    • No:21760
    • Release Date:2018/08/22 16:29
  • Switching between External operation mode and PU operation mode

    Assign X16 signal, and set Pr.79 to "0", to switch the operation mode with turning ON/OFF X16 signal. More Details >>

    • No:21288
    • Release Date:2018/08/22 16:26
  • Megger test

    When carrying out the megger test of the inverter, shorten all the terminals R, S, T, U, V, and W of the main circuit and use the 500 VDC megger for earth. D... More Details >>

    • No:21327
    • Release Date:2018/08/22 16:27
  • Brake unit

    The resistors cannot be used in combination other than described. Operations of brake units and inverters are not verified. When resistors are used in uncert... More Details >>

    • No:21328
    • Release Date:2018/08/22 16:27

251-260 of Total 294

Inquiries