Start main contents

Factory Automation

FAQ

Factory Automation

FAQAbout Products

  • Font Size
  • S
  • M
  • L

FAQ within [ FREQROL-F700P ]

271-280 of Total 294

prev 28 / 30page next
  • CC-Link

    Use Pr.542 to set the station number and Pr.543 to set the baud rate.To set the baud rate to 10 Mbps, set Pr.543 to "4". More Details >>

    • No:21839
    • Release Date:2018/08/22 16:29
  • CC-Link

    You can check the fault records with Pr.544 (CC-Link extended setting) set to "12" for double setting.Set H74 for the instruction code and turn ON RYF. More Details >>

    • No:21829
    • Release Date:2018/08/22 16:29
  • Programmable controller

    Please use the inverter optional FR-A7AY.It supports voltage output (0 to 10 VDC) and current output (0 to 20 mA DC).For the voltage output (0 to 10 VDC), th... More Details >>

    • No:21812
    • Release Date:2018/08/22 16:29
  • CC-Link

    You cannot monitor the running frequency and conveyor speed (machine speed) simultaneously.The inverter does not have a function to output them simultaneously. More Details >>

    • No:21827
    • Release Date:2018/08/22 16:29
  • Monitor indicator

    No. You cannot check the accumulated number of rotations on the monitor.   More Details >>

    • No:21715
    • Release Date:2018/08/22 16:29
  • Speed command

    Calibrate the terminal 2 bias. More Details >>

    • No:21281
    • Release Date:2018/08/22 16:26
  • 400 V inverter

    No, it does not run. "Err" is displayed when it is operated. Always input the same voltage (400 V) to the main power supply and control power supply. More Details >>

    • No:21179
    • Release Date:2018/08/22 16:26
  • CC-Link

    You can use it with the 700 series inverters. Note that the installation method of the card differs for the FR-E700 series and FR-A700/F700 series.If you hav... More Details >>

    • No:21887
    • Release Date:2018/08/22 16:29
  • CC-Link

    Up to 42 units can be connected. (When only inverters are connected) More Details >>

    • No:21873
    • Release Date:2018/08/22 16:29
  • CC-Link

    Yes. The FR-A7NC E kit contains a dedicated front cover since its size changes by the installed board.You can additionally purchase the FR-A7NC E kit cover o... More Details >>

    • No:21889
    • Release Date:2018/08/22 16:29

271-280 of Total 294

Inquiries