Start main contents

Factory Automation

FAQ

Factory Automation

FAQAbout Products

  • Font Size
  • S
  • M
  • L

FAQ within [ FREQROL-F700P ]

21-30 of Total 294

prev 3 / 30page next
  • CC-Link

    Create a ladder program to read inverter faults on the programmable controller.Set the instruction code (H74-H77) and turn ON the instruction code execution ... More Details >>

    • No:21886
    • Release Date:2018/08/22 16:29
  • Programmable controller

    Please use the inverter optional FR-A7AY.It supports voltage output (0 to 10 VDC) and current output (0 to 20 mA DC).For the voltage output (0 to 10 VDC), th... More Details >>

    • No:21812
    • Release Date:2018/08/22 16:29
  • CC-Link

    You can check the fault records with Pr.544 (CC-Link extended setting) set to "12" for double setting.Set H74 for the instruction code and turn ON RYF. More Details >>

    • No:21829
    • Release Date:2018/08/22 16:29
  • CC-Link

    Use Pr.542 to set the station number and Pr.543 to set the baud rate.To set the baud rate to 10 Mbps, set Pr.543 to "4". More Details >>

    • No:21839
    • Release Date:2018/08/22 16:29
  • CC-Link

    Set Pr.79 (Operation mode) setting value to "0", "2", or "6", Pr.340 (Communication startup mode selection) other than the setting value, Pr.542 (Station num... More Details >>

    • No:21896
    • Release Date:2018/08/22 16:29
  • FR-PU04

    While the FR-PU04 does not display parameter names, it displays parameter numbers and you can set them. More Details >>

    • No:21919
    • Release Date:2018/08/22 16:30
  • 400 V inverter

    No, it does not run. "Err" is displayed when it is operated. Always input the same voltage (400 V) to the main power supply and control power supply. More Details >>

    • No:21179
    • Release Date:2018/08/22 16:26
  • FR-PA07

    No, we have no cable 50 cm long. The optional cables 1 m, 3 m, and 5 m long are available. (1 m: FR-CB201, 3 m: FR-CB203, 5 m: FR-CB205) More Details >>

    • No:21365
    • Release Date:2018/08/22 16:27
  • Programmable controller

    The error LED on the master side of the programmable controller blinks (faulty station present).According to the SW80 station information, an error flag is a... More Details >>

    • No:21813
    • Release Date:2018/08/22 16:29
  • CC-Link

    You can select from the output power (in 0.01 kW units) and cumulative energy (in 1 kWh/0.01 kWh units). More Details >>

    • No:21885
    • Release Date:2018/08/22 16:29

21-30 of Total 294

Inquiries