Start main contents

Factory Automation

FAQ

Factory Automation

FAQAbout Products

  • Font Size
  • S
  • M
  • L

FAQ within [ FREQROL-F700P ]

41-50 of Total 294

prev 5 / 30page next
  • Changing the control method

    Set Pr.71 (Applied motor), Pr.80 (Motor capacity), Pr.81 (Number of motor poles), and Pr.800 (Control method selection). More Details >>

    • No:21245
    • Release Date:2018/08/22 16:26
  • Driving a single-phase motor

    No, it cannot. More Details >>

    • No:21253
    • Release Date:2018/08/22 16:26
  • CC-Link communication

    After setting Pr.79 (Operation mode selection) to "2" and Pr.340 (Communication startup mode selection) to "10", reset the inverter (or power ON again) to st... More Details >>

    • No:21256
    • Release Date:2018/08/22 16:26
  • Motor specifications setting

    Yes.Set Pr.19 (Base frequency voltage) to "200 V".200 V output will be obtained during 60 Hz operation. More Details >>

    • No:21717
    • Release Date:2018/08/22 16:29
  • CC-Link

    You can use it with the 700 series inverters. Note that the installation method of the card differs for the FR-E700 series and FR-A700/F700 series.If you hav... More Details >>

    • No:21887
    • Release Date:2018/08/22 16:29
  • Automatic restart after instantaneous power failure

    The inverter restart operation is disabled at turn-OFF of the CS signal while a value other than "9999" (with restart) is set in Pr.57. The terminals CS and ... More Details >>

    • No:21255
    • Release Date:2018/08/22 16:26
  • Terminal indicator lamp

    The inverter outputs the peak voltage 300 to 400 VDC of the bus voltage not in a pure sine wave but a in a PWM waveform. Check if the lamp to be connected ca... More Details >>

    • No:21323
    • Release Date:2018/08/22 16:27
  • Coasting

    1. Set Pr.162 to "10" (Frequency search at every start).2. You can ignore the setting if the motor excitation current is unknown. More Details >>

    • No:21718
    • Release Date:2018/08/22 16:29
  • Control terminal

    You also need to set Pr.79 (Operation mode) to "3". More Details >>

    • No:21844
    • Release Date:2018/08/22 16:29
  • CC-Link

    You can start/stop operation, set the frequency, read/write parameters, and monitor the inverter via CC-Link communication. More Details >>

    • No:21901
    • Release Date:2018/08/22 16:29

41-50 of Total 294

Inquiries