Start main contents

Factory Automation

FAQ

Factory Automation

FAQAbout Products

  • Font Size
  • S
  • M
  • L

FAQ within [ FREQROL-F700P ]

61-70 of Total 295

prev 7 / 30page next
  • Graph function in FR-Configurator

    Even the USB is used, FR Configurator requires at least 50 ms sampling time (for each monitoring item). In this case, since three types of data are monitored... More Details >>

    • No:21310
    • Release Date:2018/08/22 16:26
  • Automatic restart after instantaneous power failure

    The inverter restart operation is disabled at turn-OFF of the CS signal while a value other than "9999" (with restart) is set in Pr.57. The terminals CS and ... More Details >>

    • No:21255
    • Release Date:2018/08/22 16:26
  • Proportional band of multiple inverters

    By importing the operation frequency from the AM terminal (analog output) of the first inverter to the FR-FH (ratio setter), the operation command which is p... More Details >>

    • No:21250
    • Release Date:2018/08/22 16:26
  • 4 to 20 mA output

    Yes. It is available by using the FR-A7AY (plug-in option). By setting Pr.307 (Setting for zero analog output) to "20" and Pr.309 (Analog output signal volta... More Details >>

    • No:21246
    • Release Date:2018/08/22 16:26
  • External operation

    The inverter has the calibration function.Use Pr.125 (Terminal 2 frequency setting gain frequency) and Pr.C4 (Terminal 2 frequency setting gain) for calibrat... More Details >>

    • No:21849
    • Release Date:2018/08/22 16:29
  • Frequency setting

    Check the setting of Pr.79 (Operation mode).If the setting value is "2", frequency commands from an external terminal is effective and the frequency setting ... More Details >>

    • No:21797
    • Release Date:2018/08/22 16:29
  • Package

    It is the fixing screw for the inverter cooling fan cover.The size and number of screws depend on the model and capacity.(When exporting the product to the E... More Details >>

    • No:21746
    • Release Date:2018/08/22 16:29
  • Switching between external operation and NET operation

    You can switch between external operation and NET operation by turning ON/OFF the terminal X66 (RM). You can switch while Pr.79 (Operation mode) is set to "6... More Details >>

    • No:21688
    • Release Date:2018/08/22 16:28
  • Input phase loss

    Check if the input side voltage is equally applied to all three phases. The S phase voltage may be low because the input current flows when the voltage of th... More Details >>

    • No:21340
    • Release Date:2018/08/22 16:27
  • Countermeasure against noises

    Yes. The carrier frequency can be decreased by the setting of Pr.72 (PWM frequency selection). More Details >>

    • No:21338
    • Release Date:2018/08/22 16:27

61-70 of Total 295

Inquiries