Start main contents

Factory Automation

FAQ

Factory Automation

FAQAbout Products

  • Font Size
  • S
  • M
  • L

FAQ within [ FREQROL-E500 ]

21-30 of Total 85

prev 3 / 9page next
  • Dealing with Err.

    The following causes are probable for persistent Err. display: 1. The terminals RES and SD are always short-circuited. 2. Operation panel contact or operatio... More Details >>

    • No:21412
    • Release Date:2018/08/22 16:27
  • Operation at external operation/stop

    It is recommended to turn OFF the start signals (STF and STR) when stopping the inverter.In this case, it is not probable that the motor rotates due to a cal... More Details >>

    • No:22102
    • Release Date:2018/08/22 16:31
  • FR-E520 operation mode (Pr.79) selection

    The FR-E500 manufactured before May 1998 behaved as you mentioned, and the potentiometer becomes unavailable once you set the frequency on the operation pane... More Details >>

    • No:21525
    • Release Date:2018/08/22 16:28
  • "Err" is displayed when STF signal turns ON

    Possible causes are:1. The reset signal (RES) is ON. 2. The built-in CPU is not working properly due to contact faults of the inverter parts. Check the exte... More Details >>

    • No:21484
    • Release Date:2018/08/22 16:27
  • CC-Link monitor and parameter setting

    1. Since you can monitor the output frequency independently, you do not need to switch monitoring by the monitor commands. Assign the remote register RWr0 to... More Details >>

    • No:21418
    • Release Date:2018/08/22 16:27
  • Endurance

    The estimated lives of the parts of the FREQROL-E500 are as follows: Cooling fan at surrounding air temperature of 35 deg C???30,000 hrsPower supply smoothin... More Details >>

    • No:22071
    • Release Date:2018/08/22 16:30
  • Permissible brake duty

    When consuming the regenerative power with the brake resistor, the brake transistor is triggered at a certain voltage to make the brake resistor use the rege... More Details >>

    • No:22074
    • Release Date:2018/08/22 16:30
  • Connecting operation panel to enclosure

    To connect the operation panel to the enclosure, use the parameter unit connection cable FR-CB201, FR-CB203, or FR-CB205. The maximum cable length is 5 m. No... More Details >>

    • No:21542
    • Release Date:2018/08/22 16:28
  • External wiring for CC-Link operation

    For the combination of the FR-A500 + FR-A5NC, Pr.338 and Pr.339 are used to specify whether the external signals or CC-Link commands are used to set the runn... More Details >>

    • No:21973
    • Release Date:2018/08/22 16:30
  • Items controllable via CC-Link

    1. Not all items can be controlled.   - Functions that cannot be controlled JOG, AU, CS, OH, X10, X11, X12, and X16 functions (Other functions can be control... More Details >>

    • No:21459
    • Release Date:2018/08/22 16:27

21-30 of Total 85

Inquiries