FAQ


FAQAbout Products
- FAQ > Controllers > Programmable Controllers MELSEC
FAQ
Keyword Search
Programmable Controllers MELSEC
FAQ within [ Programmable Controllers MELSEC ]
-
Ethernet cables for the CC-Link IE Field Network
General-purpose Ethernet cables that meet the 1000BASE-T standard (category 5e or higher) can be used. We recommend double shielded cables. Recommended pro... More Details >>
- No:22989
- Release Date:2018/09/03 17:31
- Update:2019/06/27 15:47
- Category: Network related products
-
Displaying the next page in the Print Preview window
It is only possible to preview the first page to verify the print size and form. More Details >>
- No:22924
- Release Date:2018/09/03 17:30
- Category: Engineering Software
-
CW Workbench can be purchased from Mitsubishi Electric. We also accept license applications. More Details >>
- No:22880
- Release Date:2018/09/03 17:30
- Category: Engineering Software
-
Recommended cables for the MODBUS(R) interface module QJ71MT91
For 100BASE-TX, shielded twisted pair cables (STP cables) with category 5 can be used.For 10BASE-T, Straight and unshielded twisted pair cables (UTP cables) ... More Details >>
- No:22659
- Release Date:2018/09/03 17:29
- Category: MELSEC-Q Series
-
How to set file register setting
No setting is required.File registers are enabled by default in basic model QCPU. More Details >>
- No:22555
- Release Date:2018/09/03 17:29
- Category: MELSEC-Q Series
-
Regarding sending files in an SD Memory Card by Mail
Yes, as long as the capacity is expandable to the file register (R), it can be transmitted by using the file operation instruction. When sending, please set... More Details >>
- No:44369
- Release Date:2024/03/27 16:41
- Category: MELSEC iQ-F Series , Network/Communication
-
Parameter setting of CC-Link IE Field Network
No, you do not have to set the network range assignment parameters for slave stations. By setting the network range assignment parameters for a master statio... More Details >>
- No:23066
- Release Date:2018/09/03 17:31
- Category: Network related products
-
CD terminal setting of the QJ71C24N
"The CD terminal is not checked" has been set by default. More Details >>
- No:23065
- Release Date:2018/09/03 17:31
- Category: Network related products
-
Whether or not multiple QJ72LP25-25 modules can be mounted
No, only a single QJ72LP25-25 can be mounted (and is to be mounted on the CPU slot on a main base unit). More Details >>
- No:23042
- Release Date:2018/09/03 17:31
- Category: Network related products
-
PLC parameter setting for QJ61BT11N
If the Network Parameter is used, CC-Link communication does not need the Select setting in the I/O assignment setting of the PLC parameter.If the parameter ... More Details >>
- No:23002
- Release Date:2018/09/03 17:31
- Category: Network related products
991-1000 of Total 1023