FAQ


FAQAbout Products
- FAQ > Controllers > Programmable Controllers MELSEC
FAQ
Keyword Search
Programmable Controllers MELSEC
FAQ within [ Programmable Controllers MELSEC ]
-
The number of FB definitions created in a project has no limitation. More Details >>
- No:22900
- Release Date:2018/09/03 17:30
- Category: Engineering Software
-
How to paste values in the device batch monitor window into an Excel sheet
Copy and paste operations cannot be carried out for values displayed in the device batch monitor window. To paste the values into an Excel sheet, read the d... More Details >>
- No:22888
- Release Date:2018/09/03 17:30
- Update:2018/09/22 15:54
- Category: Engineering Software
-
A message that says "A T/C coil with the same No. exists."
It is a confirmation message telling a user that there is a device, T or C, that has become a duplicated coil in the same program and the coil is given the s... More Details >>
- No:22859
- Release Date:2018/09/03 17:30
- Category: Engineering Software
-
Accessing a QnA compatible Ethernet interface module via a router using GX Developer
For GX Developer, a connection via a QnA compatible Ethernet interface module allows communication only within the same segment. Via a router, it is impossib... More Details >>
- No:22845
- Release Date:2018/09/03 17:30
- Category: Engineering Software
-
Removal of SD memory card during logging in L series
An error will occur in CPU. More Details >>
- No:22812
- Release Date:2018/09/03 17:30
- Category: MELSEC-L Series
-
Alive check for built-in Ethernet port LCPU
When the protocol is set to TCP, KeepAlive check is performed. (Checking for a response to KeepAlive ACK message) An alive check message is sent five seconds... More Details >>
- No:22782
- Release Date:2018/09/03 17:30
- Category: MELSEC-L Series
-
Cable length to connect to built-in Ethernet port in LCPU
The maximum length between a hub and a node is 100 m. The max. length connectable to a hub is 200m.When repeater hubs are used in cascade connection, the max... More Details >>
- No:22781
- Release Date:2018/09/03 17:30
- Category: MELSEC-L Series
-
Uncheck "Check battery", an item of "Error Check", in the [PLC RAS setting] ([PLC Parameter] -> [PLC RAS setting]). More Details >>
- No:22681
- Release Date:2018/09/03 17:29
- Update:2018/09/21 14:12
- Category: MELSEC-Q Series
-
The numbers of POUs and steps of "Allocate Memory for 'Online Change'" in GX Works2
The maximum number of steps that an online change can process at a time is 512. More Details >>
- No:22672
- Release Date:2018/09/03 17:29
- Category: MELSEC-Q Series
-
The fixed buffer data areas in the buffer memory are used for communication for FROM/TO instructions. The areas used in communication for FROM/TO instruction... More Details >>
- No:22656
- Release Date:2018/09/03 17:29
- Category: MELSEC-Q Series
611-620 of Total 1023