FAQ


FAQAbout Products

- FAQ > Controllers > Programmable Controllers MELSEC
FAQ
Keyword Search
Programmable Controllers MELSEC
FAQ within [ Programmable Controllers MELSEC ]
-
Regarding remote I/O expansion for FX5S CPU module
It is possible to connect to remote I/O with CC-Link IE Field Network Basic. Up to 16 remote stations can be connected. More Details >>
- No:40041
- Release Date:2023/08/24 15:45
- Update:2025/03/13 10:08
- Category: MELSEC iQ-F Series , CPU Module , Network/Communication
-
Regarding SFC Language Support
The FX5 CPU module supports SFC language with the following firmware versions. ・FX5U/FX5UC Ver. 1.220 or later ・FX5UJ Ver. 1.050 or later ・FX5S Ver. 1.010... More Details >>
- No:40043
- Release Date:2023/08/24 15:47
- Category: MELSEC iQ-F Series , CPU Module , Engineering Software
-
Periodic replacement is recommended. For example, standard life of FX3U-32BL is 5 years (at ambient temperature of 25). The life of the battery changes wit... More Details >>
- No:22262
- Release Date:2018/08/30 13:48
- Category: MELSEC-F Series , Main Unit , Accessories
-
Regarding the number of available channels of the built-in high speeed counters.
The high-speed counter supports 1-phase 1-input, 1-phase 2-input, 2-phase 2-input. The built-in counter in the CPU module can input up to 8ch. However,... More Details >>
- No:22310
- Release Date:2018/08/30 13:55
- Update:2023/02/13 11:42
- Category: MELSEC iQ-F Series , CPU Module , High-Speed Counter
-
I/O assignment of PLC parameters with GX Works3
"PC Parameter" in GX Works2 is "Parameter" in GX Works3. You can set the I/O assignment from "Module Configuration" or "System Parameter". <Setting fr... More Details >>
- No:22475
- Release Date:2018/09/03 17:28
- Update:2018/09/19 14:42
- Category: MELSEC iQ-R Series
-
Follow the procedure below to insert a high-speed timer.- Click the Coil button on the toolbar or press the function key F7, then enter "HT[ ] K[ ]".- Click ... More Details >>
- No:22528
- Release Date:2018/09/03 17:28
- Category: MELSEC-Q Series
-
Behavior of sequence program in event of momentary power failure in QCPU
(1) When a momentary power failure occurs for a period not longer than the allowable momentary power failure time When the momentary power failure occurs, t... More Details >>
- No:22587
- Release Date:2018/09/03 17:29
- Update:2018/09/20 17:41
- Category: MELSEC-Q Series
-
Deleting GX Developer when installing GX Works2
GX Developer does not need deleting when GX Works2 is installed. More Details >>
- No:22670
- Release Date:2018/09/03 17:29
- Category: MELSEC-Q Series
-
Communication between Ethernet and FL-net
The communication between the Ethernet interface module and FL-net (OPCN-2) interface module cannot be established. More Details >>
- No:22683
- Release Date:2018/09/03 17:29
- Category: MELSEC-Q Series
-
The data logging file transfer function allows for transfer of the logging data to an upper server regularly. It is transferred when data logging is switched... More Details >>
- No:22741
- Release Date:2018/09/03 17:29
- Category: MELSEC-L Series
661-670 of Total 1010