FAQ
FAQAbout Products
- FAQ > Controllers > Programmable Controllers MELSEC
FAQ
Keyword Search
Programmable Controllers MELSEC
FAQ within [ Programmable Controllers MELSEC ]
-
Operation during power failure
It stops during execution. More Details >>
- No:22764
- Release Date:2018/09/03 17:30
- Category: MELSEC-L Series
-
The number of LCPU extension blocks
(1) The number of modules to be connected- Main block: up to 10 modules- Extension block: up to 11 modules(2) The number of extension blocks- L02CPU, L02CPU-... More Details >>
- No:22750
- Release Date:2018/09/03 17:29
- Category: MELSEC-L Series
-
Update timing of LD75 current feed value and machine feed value
The values are updated at the timing described below. - Current feed value: 0.9 ms - Machine feed value: 0.9 ms More Details >>
- No:22748
- Release Date:2018/09/03 17:29
- Category: MELSEC-L Series
-
Difference between L02CPU-P and L02CPU
In L02CPU-P, the general-purpose output of the built-in I/O is source type. In L02CPU, the general-purpose output of the built-in I/O is sink type. More Details >>
- No:22743
- Release Date:2018/09/03 17:29
- Category: MELSEC-L Series
-
L63P compatibility with L series CPU packages
It is possible to remove L61P and use L63P. More Details >>
- No:22742
- Release Date:2018/09/03 17:29
- Category: MELSEC-L Series
-
Turning OFF the power with the battery error occurring
The error history will be deleted. More Details >>
- No:22734
- Release Date:2018/09/03 17:29
- Category: MELSEC-L Series
-
Logging data storage in a USB memory
GX LogViewer function of Mitsubishi GOT (GT16) extracts the logging data to a USB memory attached to the USB interface on the front of the GOT. More Details >>
- No:22730
- Release Date:2018/09/03 17:29
- Category: MELSEC-L Series
-
Pulse width with which the QX42 recognizes all pulses
Maximum scan time (10 ms) + Response time (10 ms) = Pulse width with which the module recognizes all pulses (20 ms) More Details >>
- No:22720
- Release Date:2018/09/03 17:29
- Category: MELSEC-Q Series
-
Data communications between programmable controllers
Any data can be sent and received if the socket communication function instructions are used. More Details >>
- No:22702
- Release Date:2018/09/03 17:29
- Category: MELSEC-Q Series
-
Uncheck "Check battery", an item of "Error Check", in the [PLC RAS setting] ([PLC Parameter] -> [PLC RAS setting]). More Details >>
- No:22681
- Release Date:2018/09/03 17:29
- Update:2018/09/21 14:12
- Category: MELSEC-Q Series
761-770 of Total 976