FAQ


FAQAbout Products
- FAQ > Drive Products > Inverters-FREQROL > Others
FAQ
Keyword Search
FAQ within [ Others ]
-
Countermeasure against noise on input side
In general, the line noise filter (FR-BLF) is used against the power supply noise. The AC reactor also works. As other countermeasures:- Use a metal conduit ... More Details >>
- No:21517
- Release Date:2018/08/22 16:28
-
Do you have a sample program for 485 communication?
We do not offer a sample program for the programmable controller. Refer to the Instruction Manual and create the program by yourself. More Details >>
- No:21522
- Release Date:2018/08/22 16:28
-
Do not carry out a pressure test. As for a megger test, carry out the test with 500 VDC as describes in the Instruction Manual of the inverter. More Details >>
- No:20967
- Release Date:2018/08/22 16:25
-
Imbalanced input and output side power supplies
1. In general, the input power of the inverter is always larger than the output power because the inverter loss is added to the motor loss. 2. In both of cas... More Details >>
- No:21473
- Release Date:2018/08/22 16:27
-
You can reuse the brake units used with the FR-A series, including the FR-RC power regeneration converter, FR-BU, and BU brake unit. You can also use the hig... More Details >>
- No:21658
- Release Date:2018/08/22 16:28
-
The setting memo of the parameter list seal is not provided with the FR-A500 Instruction Manual. More Details >>
- No:21485
- Release Date:2018/08/22 16:27
-
You can remove the parameter unit FR-PU02 and install the FR-CU01 there. However, since the interface for the parameter unit is used, the communication speed... More Details >>
- No:21625
- Release Date:2018/08/22 16:28
-
Installation dimensions of the heat sink panel through attachment
The heat sink panel through attachment to the FR-A520-5.5K inverter consist of the top installation frame, bottom installation frame, and upper cover. The to... More Details >>
- No:21520
- Release Date:2018/08/22 16:28
-
Please refer to the attached material. Figure 1 More Details >>
- No:21922
- Release Date:2018/08/22 16:30
-
Acquisition of pressure-resistant explosion-proof certification
The test institutes assigned by the Minister of Health, Labour and Welfare (National Institute of Occupational Safety and Health and Technology Institution o... More Details >>
- No:21510
- Release Date:2018/08/22 16:28
11-20 of Total 53