FAQ


FAQAbout Products
- FAQ > Drive Products > Inverters-FREQROL > FREQROL-E700
FAQ
Keyword Search
FAQ within [ FREQROL-E700 ]
-
The first priority window of the monitor may be set to the current.When the current is displayed on the monitor (the unit is "A"), press "SET" to switch to t... More Details >>
- No:21765
- Release Date:2018/08/22 16:29
-
The mounting screw is not supplied. The mounting screw is supplied with the operation panel. Open the screw hole according to the dimension. (The M3 screw is... More Details >>
- No:21361
- Release Date:2018/08/22 16:27
-
If "HOLD" is displayed, the key lock mode enabled. Press the "MODE" key for two seconds. Then, change the setting of Pr.79 to "1". More Details >>
- No:21350
- Release Date:2018/08/22 16:27
-
Check if the input side voltage is equally applied to all three phases. The S phase voltage may be low because the input current flows when the voltage of th... More Details >>
- No:21340
- Release Date:2018/08/22 16:27
-
Graph function in FR-Configurator
Even the USB is used, FR Configurator requires at least 50 ms sampling time (for each monitoring item). In this case, since three types of data are monitored... More Details >>
- No:21310
- Release Date:2018/08/22 16:26
-
Proportional band of multiple inverters
By importing the operation frequency from the AM terminal (analog output) of the first inverter to the FR-FH (ratio setter), the operation command which is p... More Details >>
- No:21250
- Release Date:2018/08/22 16:26
-
The inverter has the calibration function.Use Pr.125 (Terminal 2 frequency setting gain frequency) and Pr.C4 (Terminal 2 frequency setting gain) for calibrat... More Details >>
- No:21849
- Release Date:2018/08/22 16:29
-
Operation stop, frequency setting
Set Pr.79 (Operation mode) to "1" (PU operation mode). More Details >>
- No:21819
- Release Date:2018/08/22 16:29
-
It is the fixing screw for the inverter cooling fan cover.The size and number of screws depend on the model and capacity.(When exporting the product to the E... More Details >>
- No:21746
- Release Date:2018/08/22 16:29
-
Switching between external operation and NET operation
You can switch between external operation and NET operation by turning ON/OFF the terminal X66 (RM). You can switch while Pr.79 (Operation mode) is set to "6... More Details >>
- No:21688
- Release Date:2018/08/22 16:28
91-100 of Total 394