Start main contents

Factory Automation

FAQ

Factory Automation

FAQAbout Products

  • Font Size
  • S
  • M
  • L

FAQ within [ FREQROL-E700 ]

91-100 of Total 394

prev 10 / 40page next
  • FR-PA07

    The mounting screw is not supplied. The mounting screw is supplied with the operation panel. Open the screw hole according to the dimension. (The M3 screw is... More Details >>

    • No:21361
    • Release Date:2018/08/22 16:27
  • Applied terminal

    As described in the instruction manual, use the shielded cable or twisted cable to avoid the influence of noises. More Details >>

    • No:21344
    • Release Date:2018/08/22 16:27
  • Input phase loss

    Check if the input side voltage is equally applied to all three phases. The S phase voltage may be low because the input current flows when the voltage of th... More Details >>

    • No:21340
    • Release Date:2018/08/22 16:27
  • Parameter

    Press the "MODE" key on the operation panel several times to display "P.0" and parameter setting screen. Then turn the setting dial to display "C..." screen ... More Details >>

    • No:21336
    • Release Date:2018/08/22 16:27
  • Parameter copy of FR-Configurator

    The parameter can be copied to only one inverter. More Details >>

    • No:21306
    • Release Date:2018/08/22 16:26
  • External 0 to 10 VDC input

    Checking terminals used:Are the terminals MRS and RES open?Are the terminals STR and SD short-circuited correctly?Is the voltage/current switch of the termin... More Details >>

    • No:21916
    • Release Date:2018/08/22 16:30
  • Switching between PU and NET operation modes

    Set Pr.340 (Communication startup mode selection) to "10".The operation mode can be switched between PU and NET by assigning X65 (PU-NET operation switching)... More Details >>

    • No:21878
    • Release Date:2018/08/22 16:29
  • Control terminal

    Yes. (Terminal SDs are connected with each other inside of the inverter.) More Details >>

    • No:21845
    • Release Date:2018/08/22 16:29
  • Package

    It is the fixing screw for the inverter cooling fan cover.The size and number of screws depend on the model and capacity.(When exporting the product to the E... More Details >>

    • No:21746
    • Release Date:2018/08/22 16:29
  • Switching between external operation and NET operation

    You can switch between external operation and NET operation by turning ON/OFF the terminal X66 (RM). You can switch while Pr.79 (Operation mode) is set to "6... More Details >>

    • No:21688
    • Release Date:2018/08/22 16:28

91-100 of Total 394

Inquiries