FAQ


FAQAbout Products
- FAQ > Drive Products > Inverters-FREQROL > FREQROL-E700
FAQ
Keyword Search
FAQ within [ FREQROL-E700 ]
-
Supported model for FR-Configurator
The FR-E700 is not supported by FR-SW2-SETUP-WJ. The FR-E700 series are supported by FR-SW3-SETUP-WJ. This software can be downloaded from the Mitsubishi Ele... More Details >>
- No:21314
- Release Date:2018/08/22 16:26
-
When Pr.79 is set to "3", the JOG operation is not available by turning ON the terminal JOG.Instead of the JOG function, you can set the low-speed RL of the ... More Details >>
- No:21760
- Release Date:2018/08/22 16:29
-
Press the "MODE" key on the operation panel several times to display "P.0" and parameter setting screen. Then turn the setting dial to display "C..." screen ... More Details >>
- No:21336
- Release Date:2018/08/22 16:27
-
Normally, the inverter starts up in the NET operation mode at power ON when Pr.340 is set to "10" and Pr.79 is set to "0". When it starts up in the PU operat... More Details >>
- No:21319
- Release Date:2018/08/22 16:27
-
Set Pr.340 (Communication startup mode selection) to "1" or "2".Also, by setting Pr.79 (Operation mode selection) to "0", "2", or "6", the inverter enters th... More Details >>
- No:21879
- Release Date:2018/08/22 16:29
-
The FR-E700, D700, F700PJ may activate input phase loss protection "E.ILF" if the phase-to-phase voltage of the power supply has become largely unbalanced. More Details >>
- No:21339
- Release Date:2018/08/22 16:27
-
It is said that the EEPROM has a lifetime of 100,000 write cycles. When the data is written every time the frequency changes, the life of the EEPROM may not ... More Details >>
- No:20996
- Release Date:2018/08/22 16:25
-
Check the connection with the meter.If the terminal FM is connected to the positive terminal and the terminal SD is connected to the negative terminal of the... More Details >>
- No:21762
- Release Date:2018/08/22 16:29
-
Switching between external operation and NET operation
You can switch between external operation and NET operation by turning ON/OFF the terminal X66 (RM). You can switch while Pr.79 (Operation mode) is set to "6... More Details >>
- No:21688
- Release Date:2018/08/22 16:28
-
Since the operation panels of the E700, D700, and F700PJ do not have keys for the forward (FWD) and reverse (REV) rotations, you can only command rotation in... More Details >>
- No:21841
- Release Date:2018/08/22 16:29
21-30 of Total 393